Schedule Viewer
Last schedule upload: D3-R25005-00-RPL10 — 8463 activities — 05/05/2026 09:13 AM CT
RPL10 - GC LIVE SCHEDULE - Data Date 20260426.xer
· Uploaded May 05, 2026 02:13 PM
· 8463 activities
Experimental
Auto-populate checklist dates from schedule:
100
Activities Shown
0
Completed
0
In Progress
0
Critical
| Activity ID | Activity Name | WBS | Status | Start | Finish | Dur (d) | Rem (d) | % Comp | Float (d) |
|---|---|---|---|---|---|---|---|---|---|
RPL10.INT.NS4.01650 |
RPL10.Interior.NS4 - Control Fault Domain 4 SQ10.1 - Install LV Side Aisle HAC Busway | LV Side Tie-ins | Not Started | 06/12/26 | 06/17/26 | 5.0 | 5.0 |
|
195.0 |
RPL10.INT.NS4.02720 |
RPL10.Interior.NS4 - OFE - Control Fault Domain 5 SQ11.1 (LV Side Aisle) | OFE NS4 Control Fault Domain 5 | Not Started | 06/12/26 | 06/17/26 | 5.0 | 5.0 |
|
165.0 |
RPL10.WP4.027520 |
RPL10.Conn NS1.CFD5.48<>26-30 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] | Prefab | Not Started | 06/12/26 | 06/17/26 | 5.0 | 5.0 |
|
136.2 |
RPL10.WP4.027720 |
RPL10.Conn NS1.CFD4.48<>26-30 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] | Prefab | Not Started | 06/12/26 | 06/17/26 | 5.0 | 5.0 |
|
136.2 |
RPL10.WP4.027860 |
RPL10.Conn NS1.CFD3.48<>11-15 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] | Prefab | Not Started | 06/12/26 | 06/18/26 | 6.2 | 6.2 |
|
120.0 |
RPL10.WP4.028520 |
RPL10.Conn NS2.CFD6.48<>26-30 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] | Prefab | Not Started | 06/12/26 | 06/17/26 | 5.0 | 5.0 |
|
147.5 |
RPL10.WP4.028720 |
RPL10.Conn NS2.CFD5.48<>26-30 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] | Prefab | Not Started | 06/12/26 | 06/17/26 | 5.0 | 5.0 |
|
147.5 |
FR03.1280 |
FR03: PSI - NS1 - PCX H01 & H02 - FTI Quality Checks | FR03: House Power Skid Missing Panel Delay | Not Started | 06/15/26 | 06/16/26 | 2.5 | 2.5 |
|
15.0 |
FR03.1400 |
FR03: PSI - NS2 - PCX H01 & H02 - FTI Quality Checks | FR03: House Power Skid Missing Panel Delay | Not Started | 06/15/26 | 06/16/26 | 2.5 | 2.5 |
|
15.0 |
RPL.10.D.X38X1.XR |
100MW (40 MW Initial , 60 MW later) Cx Temp Power to MV Skids RPL10 mCUPs (South)Available | Power (XREFs) | Not Started | 06/15/26 | 06/15/26 | 0.0 | 0.0 |
|
130.0 |
RPL10.CX.MCUP.01070 |
RPL10.CX.mCup Loop 1 - L3/L4 - mCUP - Flush and Fill - NS1&2 (Phase2) | Fill and Flush | Not Started | 06/15/26 | 06/19/26 | 6.2 | 6.2 |
|
26.2 |
RPL10.CX.SSBC.01000 |
RPL10.CX.SSB COR - L3, L4, IST - WBS Summary | SSB Corridor | Not Started | 06/15/26 | 12/16/26 | 160.0 | 160.0 |
|
26.2 |
RPL10.CX.SSBC.01010 |
RPL10.CX.SSB COR - L3 | SSB Corridor | Not Started | 06/15/26 | 07/27/26 | 37.5 | 37.5 |
|
123.8 |
RPL10.INT.EF2.01230 |
RPL10.Interior.EF2 - North CRAH Gallery - Install Lower Trays | North CRAH Gallery | Not Started | 06/15/26 | 06/19/26 | 6.2 | 6.2 |
|
18.8 |
RPL10.INT.EF2.01270 |
RPL10.Interior.EF2 - South CRAH Gallery - Install Lower Trays | South CRAH Gallery | Not Started | 06/15/26 | 06/19/26 | 6.2 | 6.2 |
|
18.8 |
RPL10.INT.EF2.01500 |
RPL10.Interior.EF2 - EF2 West - Install Lower Trays | West EF-2 | Not Started | 06/15/26 | 06/19/26 | 6.2 | 6.2 |
|
18.8 |
RPL10.INT.EF2.01510 |
RPL10.Interior.EF2 - EF2 West - Install Lighting | West EF-2 | Not Started | 06/15/26 | 06/30/26 | 15.0 | 15.0 |
|
107.5 |
RPL10.INT.NS1.01670 |
RPL10.Interior.NS1 - Control Fault Domain 3 SQ4.1 - Pull BMS from panel to devices | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/15/26 | 07/13/26 | 25.0 | 25.0 |
|
40.0 |
RPL10.INT.NS1.01680 |
RPL10.Interior.NS1 - Control Fault Domain 3 SQ4.1 - Pull EPMS from panel to devices | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/15/26 | 07/13/26 | 25.0 | 25.0 |
|
40.0 |
RPL10.INT.NS1.01690 |
RPL10.Interior.NS1 - Control Fault Domain 3 SQ4.1 - Set UPS and Panel (2) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/15/26 | 07/13/26 | 25.0 | 25.0 |
|
33.8 |
RPL10.INT.NS3.01350 |
RPL10.Interior.NS3 - OFE - Control Fault Domain 3 SQ9.2 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary | OFE NS3 Control Fault Domain 3 | Not Started | 06/15/26 | 10/14/26 | 107.5 | 107.5 |
|
17.5 |
RPL10.INT.NS3.01370 |
RPL10.Interior.NS3 - Control Fault Domain 2 SQ8.2 - Install LV Side Aisle HAC Busway | LV Side Tie-ins | Not Started | 06/15/26 | 06/18/26 | 5.0 | 5.0 |
|
123.8 |
RPL10.INT.NS3.02620 |
RPL10.Interior.NS3 - OFE - Control Fault Domain 3 SQ9.2 (LV Side Aisle) | OFE NS3 Control Fault Domain 3 | Not Started | 06/15/26 | 06/18/26 | 5.0 | 5.0 |
|
106.2 |
RPL10.INT.NS4.01670 |
RPL10.Interior.NS4 - Control Fault Domain 4 SQ10.1 - Install LV Side Aisle Cable Tray | LV Side Tie-ins | Not Started | 06/15/26 | 06/18/26 | 5.0 | 5.0 |
|
195.0 |
RPL10.WP4.01240 |
RPL10.Conn NS1.CFD5.10 Pull Duplex Jumper (LC<>LC) [MA<>JXSW] | Pull Duplex Jumper [MA<>JXSW] | Not Started | 06/15/26 | 06/17/26 | 3.8 | 3.8 |
|
146.2 |
RPL10.WP4.027320 |
RPL10.Conn NS1.CFD6.48<>26-30 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] | Prefab | Not Started | 06/15/26 | 06/18/26 | 5.0 | 5.0 |
|
135.0 |
RPL10.WP4.028860 |
RPL10.Conn NS2.CFD4.48<>11-15 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] | Prefab | Not Started | 06/15/26 | 06/19/26 | 6.2 | 6.2 |
|
130.0 |
RPL.10.D.X3740.XG |
RMUs/MV Skids Set (Loop 1) - RPL10 NS3 | Give Milestones (XREFs) | Not Started | 06/16/26 | 06/16/26 | 0.0 | 0.0 |
|
858.8 |
RPL.10.D.X3745.XG |
RMUs/MV Skids Set (Loop 2) - RPL10 NS3 | Give Milestones (XREFs) | Not Started | 06/16/26 | 06/16/26 | 0.0 | 0.0 |
|
858.8 |
RPL10.CTRC.BB.3535 |
RPL10.Int.Build Back.Center-Corr - LO #7 - Install Remaining Cable Tray | Build Back Interior Leave Out Wall #7, #7B #9 (Center Corr) | Not Started | 06/16/26 | 06/18/26 | 3.8 | 3.8 |
|
147.5 |
RPL10.CTRC.BB.3675 |
RPL10.Int.Build Back.Center-Corr - LO #9 - Hang Drywall | Build Back Interior Leave Out Wall #7, #7B #9 (Center Corr) | Not Started | 06/16/26 | 06/18/26 | 3.8 | 3.8 |
|
141.2 |
RPL10.EY.EF2.01270 |
RPL10.EY.EF2 - Install RPL-5 FSP Road Closure For Steel Erection | Fiber Support Platform - RPL-5 | Not Started | 06/16/26 | 06/29/26 | 12.5 | 12.5 |
|
202.5 |
RPL10.EY.ENDC.01200 |
RPL10.EY.End - L2 Checklist Completion | Tie-ins | Not Started | 06/16/26 | 06/22/26 | 6.2 | 6.2 |
|
256.2 |
RPL10.EY.ENDC.01210 |
RPL10.EY.End - Install Landscaping | Hardscape and Landscape | Not Started | 06/16/26 | 07/07/26 | 18.8 | 18.8 |
|
446.2 |
RPL10.INT.ENDC.01250 |
RPL10.Interior.End-Corridor - BoW - Set Equipment / Interior | Balance of Walls & Overhead | Not Started | 06/16/26 | 06/22/26 | 6.2 | 6.2 |
|
183.8 |
RPL10.INT.NS2.01440 |
RPL10.Interior.NS2 - Control Fault Domain 4 SQ3.2 - Pull BMS from panel to devices | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/16/26 | 07/14/26 | 25.0 | 25.0 |
|
22.5 |
RPL10.INT.NS2.01450 |
RPL10.Interior.NS2 - Control Fault Domain 4 SQ3.2 - Pull EPMS from panel to devices | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/16/26 | 07/14/26 | 25.0 | 25.0 |
|
22.5 |
RPL10.INT.NS2.01460 |
RPL10.Interior.NS2 - Control Fault Domain 4 SQ3.2 - Set UPS and Panel (2) and GS.IDF N22 | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/16/26 | 07/14/26 | 25.0 | 25.0 |
|
16.2 |
RPL10.INT.NS2.01480 |
RPL10.Interior.NS2 - Control Fault Domain 5 SQ2.2 - L2 Checklist Completion | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/16/26 | 07/14/26 | 25.0 | 25.0 |
|
18.8 |
RPL10.INT.NS3.01390 |
RPL10.Interior.NS3 - Control Fault Domain 2 SQ8.2 - Install LV Side Aisle Cable Tray | LV Side Tie-ins | Not Started | 06/16/26 | 06/19/26 | 5.0 | 5.0 |
|
123.8 |
RPL10.INT.NS4.01690 |
RPL10.Interior.NS4 - Control Fault Domain 5 SQ11.1 - Install Duct (LV Side) | LV Side Tie-ins | Not Started | 06/16/26 | 06/19/26 | 5.0 | 5.0 |
|
177.5 |
RPL10.INT.NS4.01720 |
RPL10.Interior.NS4 - Tie-ins - Control Fault Domain 5 SQ11.1 - WBS Summary | Tie-Ins NS4 Control Fault Domain 5 | Not Started | 06/16/26 | 12/28/26 | 167.5 | 167.5 |
|
60.0 |
RPL10.INT.SSB.02600 |
RPL10.Interior.SSB - BoW - ACT - Close Up Inspection | Balance of Walls and OverHead | Not Started | 06/16/26 | 06/24/26 | 8.8 | 8.8 |
|
147.5 |
RPL10.INT.SSB.03140 |
RPL10.Interior.SSB - BoW - Install Door (Verify with Trades If Ready) | Balance of Walls and OverHead | Not Started | 06/16/26 | 06/24/26 | 8.8 | 8.8 |
|
147.5 |
RPL10.MCUP.LP2.1960 |
RPL10.MCUP.Loop 2 - Install Exterior Signage | Hardscape and Landscape | Not Started | 06/16/26 | 06/29/26 | 12.5 | 12.5 |
|
452.5 |
RPL10.SKN.SSB.01060 |
RPL10.SKIN.SSB - Install Awning over Doors | Glazing, Doors and Ext Devices | Not Started | 06/16/26 | 06/22/26 | 6.2 | 6.2 |
|
125.0 |
RPL10.WP2.GSIDF.2380 |
RPL10.Conn GSIDFNX05 Install Cabling (Pull, Splice & terminate) | Cabling | Not Started | 06/16/26 | 06/22/26 | 6.2 | 6.2 |
|
196.2 |
RPL10.WP2.GSIDF.2720 |
RPL10.Conn IDF Huts - (GSMDF to GSIDF) End NX10 WBS Summary | GSIDFNX10 | Not Started | 06/16/26 | 07/17/26 | 28.8 | 28.8 |
|
436.2 |
RPL10.WP2.GSIDF.2740 |
RPL10.Conn GSIDFNX10 Set Infrastructure (Racks, Waterfalls etc.) | Infrastructure | Not Started | 06/16/26 | 06/22/26 | 6.2 | 6.2 |
|
177.5 |
RPL10.WP3A.EF.03040 |
RPL10.Conn EF1B Infrasturcture 2 (Tier1 & waterfalls etc.) | Infrastructure & Cabling | Not Started | 06/16/26 | 07/14/26 | 25.0 | 25.0 |
|
160.0 |
RPL10.WP4.NS1.01220 |
RPL10.Conn NS1.CFD5 Infrastructure - WBS Summary | Infrastructure | Not Started | 06/16/26 | 06/29/26 | 12.5 | 12.5 |
|
51.2 |
RPL10.WP4.NS1.01240 |
RPL10.Conn NS1.CFD5 Infrastructure | Infrastructure | Not Started | 06/16/26 | 06/29/26 | 12.5 | 12.5 |
|
51.2 |
FR03.1300 |
FR03: PSI - NS1 - PCX H01 & H02 - 3rd Party Documentation Review | FR03: House Power Skid Missing Panel Delay | Not Started | 06/17/26 | 06/19/26 | 3.8 | 3.8 |
|
15.0 |
FR03.1420 |
FR03: PSI - NS2 - PCX H01 & H02 - 3rd Party Documentation Review | FR03: House Power Skid Missing Panel Delay | Not Started | 06/17/26 | 06/19/26 | 3.8 | 3.8 |
|
15.0 |
RPL.10.D.X33X5.XR |
Pull and Term mCUP Skids - RPL10 South | Power (XREFs) | Not Started | 06/17/26 | 06/17/26 | 0.0 | 0.0 |
|
127.5 |
RPL10.EY.NS3.01240 |
RPL10.EY.NS3 - Install GS.IDF Hut (1x GS.IDF) NX08 (06.04.26) | OFE | Not Started | 06/17/26 | 06/23/26 | 6.2 | 6.2 |
|
101.2 |
RPL10.EY.NS3.01250 |
RPL10.EY.NS3 - Install Electrical Tie-ins (include penetration detail) | Tie-ins | Not Started | 06/17/26 | 06/30/26 | 12.5 | 12.5 |
|
115.0 |
RPL10.EY.NS3.01260 |
RPL10.EY.NS3 - Tie-ins - WBS Summary | Tie-ins | Not Started | 06/17/26 | 08/05/26 | 43.8 | 43.8 |
|
172.5 |
RPL10.INT.EF1.01437 |
RPL10.Interior.EF1 - EF1 East - Install OH Tier1 Ladder Racks | East EF-1 | Not Started | 06/17/26 | 06/23/26 | 6.2 | 6.2 |
|
180.0 |
RPL10.INT.NS3.01410 |
RPL10.Interior.NS3 - Control Fault Domain 3 SQ9.2 - Install Duct (LV Side) | LV Side Tie-ins | Not Started | 06/17/26 | 06/22/26 | 5.0 | 5.0 |
|
112.5 |
RPL10.INT.NS3.01440 |
RPL10.Interior.NS3 - Tie-ins - Control Fault Domain 3 SQ9.2 (including IDF) - WBS Summary | Tie-Ins NS3 Control Fault Domain 3 | Not Started | 06/17/26 | 11/23/26 | 138.8 | 138.8 |
|
60.0 |
RPL10.INT.SSB.01520 |
RPL10.Interior.SSB - Loading Dock and Storage - Install Shelving | Loading Dock and Storage | Not Started | 06/17/26 | 06/22/26 | 5.0 | 5.0 |
|
178.8 |
RPL10.INT.SSB.01600 |
RPL10.Interior.SSB - Loading Dock and Storage - Mechanical L2 Checklist Completion | Loading Dock and Storage | Not Started | 06/17/26 | 06/30/26 | 12.5 | 12.5 |
|
173.8 |
RPL10.WP3A.EF.01000 |
RPL10.Conn EF1F Infrastructure - WBS Summary | EF1-F | Not Started | 06/17/26 | 06/30/26 | 12.5 | 12.5 |
|
113.8 |
RPL10.WP3A.EF.02020 |
RPL10.Conn EF1F Install Infrasturcture 2 (Waterfalls & VCM etc.) | RPL-1 | Not Started | 06/17/26 | 06/23/26 | 6.2 | 6.2 |
|
157.5 |
RPL10.WP3A.EF.02140 |
RPL10.Conn EF1F Install Infrasturcture 2 ( Ladder rack, Waterfalls & VCM etc.) | RPL-6 | Not Started | 06/17/26 | 06/30/26 | 12.5 | 12.5 |
|
201.2 |
RPL10.WP3A.EF.08300 |
RPL10.Conn EF1F Infrasturcture 2 (Waterfalls & VCM etc.) | EF1-F | Not Started | 06/17/26 | 06/30/26 | 12.5 | 12.5 |
|
113.8 |
RPL10.WP3A.EF.08800 |
RPL10.Conn EF1F Pull and Install OSP Cable for RPL01 | RPL-1 | Not Started | 06/17/26 | 06/30/26 | 12.5 | 12.5 |
|
151.2 |
RPL10.WP3A.EF.08820 |
RPL10.Conn EF1F Pull and Install OSP Cable for RPL06 | RPL-6 | Not Started | 06/17/26 | 06/30/26 | 12.5 | 12.5 |
|
201.2 |
RPL10.WP4.028020 |
RPL10.Conn NS1.CFD2.48<>03-05 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] | Prefab | Not Started | 06/17/26 | 06/18/26 | 2.5 | 2.5 |
|
110.0 |
RPL10.WP4.NS1.01080 |
RPL10.Conn NS1.CFD6 Network - WBS Summary | Network | Not Started | 06/17/26 | 08/20/26 | 57.5 | 57.5 |
|
40.0 |
RPL10.WP4.NS1.01100 |
RPL10.Conn NS1.CFD6 Network Suite [JXSW<>MA] Trunks | Pre ORv3 Rack | Not Started | 06/17/26 | 06/19/26 | 3.8 | 3.8 |
|
70.0 |
RPL10.WP4.NS1.03280 |
RPL10.Conn NS1.CFD2 Network - WBS Summary | Network | Not Started | 06/17/26 | 12/07/26 | 148.8 | 148.8 |
|
28.8 |
RPL10.CTRC.BB.1020 |
RPL10.Int.Build Back.Center-Corr - LO #6,8 - MEPF - OH, Lowside, Lights | Build Back Interior Leave Out Wall #6 #8 (Center Corr) | Not Started | 06/18/26 | 07/16/26 | 25.0 | 25.0 |
|
142.5 |
RPL10.CTRC.BB.1100 |
RPL10.Int.Build Back.Center-Corr - LO #6,8 - MEPF Trim Out | Build Back Interior Leave Out Wall #6 #8 (Center Corr) | Not Started | 06/18/26 | 07/09/26 | 18.8 | 18.8 |
|
142.5 |
RPL10.INT.CTRC.01490 |
RPL10.Interior.Center-Corridor - BoW - Final Punch Walk | Balance of Walls & OverHead | Not Started | 06/18/26 | 06/19/26 | 2.5 | 2.5 |
|
180.0 |
RPL10.INT.EF1.01550 |
RPL10.Interior.EF1 - EF1 West - Set Passive Panels / Racks | West EF-1 | Not Started | 06/18/26 | 06/24/26 | 6.2 | 6.2 |
|
168.8 |
RPL10.INT.NS1.01780 |
RPL10.Interior.NS1 - Control Fault Domain 2 SQ5.1 - Install Vesda / FA | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/18/26 | 07/16/26 | 25.0 | 25.0 |
|
40.0 |
RPL10.INT.NS1.01790 |
RPL10.Interior.NS1 - Control Fault Domain 2 SQ5.1 - Install FW | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/18/26 | 07/16/26 | 25.0 | 25.0 |
|
33.8 |
RPL10.INT.NS1.02280 |
RPL10.Interior.NS1 - Control Fault Domain 2 SQ5.1 - Install TW | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/18/26 | 07/16/26 | 25.0 | 25.0 |
|
33.8 |
RPL10.INT.NS1.02800 |
RPL10.Interior.NS1 - Control Fault Domain 2 SQ5.1 - Install Duct (MES Side) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/18/26 | 07/16/26 | 25.0 | 25.0 |
|
33.8 |
RPL10.INT.NS4.01115 |
RPL10.Interior.NS4 - MES Skids - EPMS Tie-In | NS4 - MES Skids | Not Started | 06/18/26 | 07/22/26 | 30.0 | 30.0 |
|
237.5 |
RPL10.INT.NS4.01770 |
RPL10.Interior.NS4 - OFE - Control Fault Domain 6 SQ12.1 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary | OFE NS4 Control Fault Domain 6 | Not Started | 06/18/26 | 11/03/26 | 121.2 | 121.2 |
|
88.8 |
RPL10.INT.NS4.01790 |
RPL10.Interior.NS4 - Control Fault Domain 5 SQ11.1 - Install LV Side Aisle HAC Busway | LV Side Tie-ins | Not Started | 06/18/26 | 06/23/26 | 5.0 | 5.0 |
|
206.2 |
RPL10.INT.NS4.02780 |
RPL10.Interior.NS4 - OFE - Control Fault Domain 6 SQ12.1 (LV Side Aisle) | OFE NS4 Control Fault Domain 6 | Not Started | 06/18/26 | 06/24/26 | 6.2 | 6.2 |
|
193.8 |
RPL10.WP4.01260 |
RPL10.Conn NS1.CFD5.11 Pull Duplex Jumper (LC<>LC) [MA<>JXSW] | Pull Duplex Jumper [MA<>JXSW] | Not Started | 06/18/26 | 06/22/26 | 3.8 | 3.8 |
|
146.2 |
RPL10.WP4.027540 |
RPL10.Conn NS1.CFD5.48<>31-35 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] | Prefab | Not Started | 06/18/26 | 06/22/26 | 3.8 | 3.8 |
|
136.2 |
RPL10.WP4.027740 |
RPL10.Conn NS1.CFD4.48<>31-35 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] | Prefab | Not Started | 06/18/26 | 06/22/26 | 3.8 | 3.8 |
|
136.2 |
RPL10.WP4.028540 |
RPL10.Conn NS2.CFD6.48<>31-35 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] | Prefab | Not Started | 06/18/26 | 06/22/26 | 3.8 | 3.8 |
|
147.5 |
RPL10.WP4.028740 |
RPL10.Conn NS2.CFD5.48<>31-35 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] | Prefab | Not Started | 06/18/26 | 06/22/26 | 3.8 | 3.8 |
|
147.5 |
GCD.RPL10.3507 |
[RPL10] TC Ready: EF Pathways complete [NS1] | TC Ready: Production Cabling - NS1 | Not Started | 06/19/26 | 06/19/26 | 0.0 | 0.0 |
|
18.8 |
GCD.RPL10.4045 |
[RPL10] TC Ready: EF Pathways complete [NS2] | TC Ready: Production Cabling - NS2 | Not Started | 06/19/26 | 06/19/26 | 0.0 | 0.0 |
|
32.5 |
GCD.RPL10.4205 |
[RPL10] TC Ready: EF Pathways complete [NS4] | TC Ready: Production Cabling - NS4 | Not Started | 06/19/26 | 06/19/26 | 0.0 | 0.0 |
|
137.5 |
GCD.RPL10.4365 |
[RPL10] TC Ready: EF Pathways complete [NS3] | TC Ready: Production Cabling - NS3 | Not Started | 06/19/26 | 06/19/26 | 0.0 | 0.0 |
|
116.2 |
RPL10.CTRC.BB.3695 |
RPL10.Int.Build Back.Center-Corr - LO #9 - Paint | Build Back Interior Leave Out Wall #7, #7B #9 (Center Corr) | Not Started | 06/19/26 | 06/25/26 | 6.2 | 6.2 |
|
141.2 |
RPL10.INT.NS3.01114 |
RPL10.Interior.NS3 - MES Skids - BMS Tie-Ins | NS3 - MES Skids | Not Started | 06/19/26 | 07/23/26 | 30.0 | 30.0 |
|
240.0 |
RPL10.INT.NS3.01490 |
RPL10.Interior.NS3 - OFE - Control Fault Domain 4 SQ10.2 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary | OFE NS3 Control Fault Domain 4 | Not Started | 06/19/26 | 10/28/26 | 115.0 | 115.0 |
|
30.0 |
RPL10.INT.NS3.01510 |
RPL10.Interior.NS3 - Control Fault Domain 3 SQ9.2 - Install LV Side Aisle HAC Busway | LV Side Tie-ins | Not Started | 06/19/26 | 06/24/26 | 5.0 | 5.0 |
|
145.0 |
RPL10.INT.NS3.02680 |
RPL10.Interior.NS3 - OFE - Control Fault Domain 4 SQ10.2 (LV Side Aisle) | OFE NS3 Control Fault Domain 4 | Not Started | 06/19/26 | 06/24/26 | 5.0 | 5.0 |
|
130.0 |
RPL10.INT.NS4.01810 |
RPL10.Interior.NS4 - Control Fault Domain 5 SQ11.1 - Install LV Side Aisle Cable Tray | LV Side Tie-ins | Not Started | 06/19/26 | 06/24/26 | 5.0 | 5.0 |
|
206.2 |