Schedule Viewer
Last schedule upload: D3-R25005-00-RPL10 — 8463 activities — 05/05/2026 09:13 AM CT
RPL10 - GC LIVE SCHEDULE - Data Date 20260426.xer
· Uploaded May 05, 2026 02:13 PM
· 8463 activities
Experimental
Auto-populate checklist dates from schedule:
100
Activities Shown
0
Completed
0
In Progress
1
Critical
| Activity ID | Activity Name | WBS | Status | Start | Finish | Dur (d) | Rem (d) | % Comp | Float (d) |
|---|---|---|---|---|---|---|---|---|---|
RPL10.INT.NS1.02780 |
RPL10.Interior.NS1 - Control Fault Domain 3 SQ4.1 - Install Duct (MES Side) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/08/26 | 07/06/26 | 25.0 | 25.0 |
|
33.8 |
RPL10.INT.NS2.02605 |
RPL10.Interior.NS2 - OFE - Control Fault Domain 4 SQ3.2 (Mech Side Aisle) | OFE NS2 Control Fault Domain 4 | Not Started | 06/08/26 | 06/24/26 | 16.2 | 16.2 |
|
-11.2 |
RPL10.INT.NS3.01230 |
RPL10.Interior.NS3 - Control Fault Domain 1 SQ7.2 - Install LV Side Aisle HAC Busway | LV Side Tie-ins | Not Started | 06/08/26 | 06/12/26 | 6.2 | 6.2 |
|
121.2 |
RPL10.INT.NS4.01114 |
RPL10.Interior.NS4 - MES Skids - BMS Tie-Ins | NS4 - MES Skids | Not Started | 06/08/26 | 07/10/26 | 30.0 | 30.0 |
|
237.5 |
RPL10.INT.NS4.01490 |
RPL10.Interior.NS4 - OFE - Control Fault Domain 4 SQ10.1 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary | OFE NS4 Control Fault Domain 4 | Not Started | 06/08/26 | 10/06/26 | 106.2 | 106.2 |
|
68.8 |
RPL10.INT.NS4.01510 |
RPL10.Interior.NS4 - Control Fault Domain 3 SQ9.1 - Install LV Side Aisle HAC Busway | LV Side Tie-ins | Not Started | 06/08/26 | 06/11/26 | 5.0 | 5.0 |
|
176.2 |
RPL10.INT.NS4.02660 |
RPL10.Interior.NS4 - OFE - Control Fault Domain 4 SQ10.1 (LV Side Aisle) | OFE NS4 Control Fault Domain 4 | Not Started | 06/08/26 | 06/11/26 | 5.0 | 5.0 |
|
157.5 |
RPL10.OFCI.7000 |
OFCI - Delivery ROJ: FE Fiber for CFD NS2.3 (ROJ ) (RVCD ) | NS2 | Not Started | 06/08/26 | 06/26/26 | 18.8 | 18.8 |
|
87.5 |
RPL10.OFCI.7020 |
OFCI - Delivery ROJ: FE Fiber for CFD NS2.2 (ROJ ) (RVCD ) | NS2 | Not Started | 06/08/26 | 06/26/26 | 18.8 | 18.8 |
|
111.2 |
RPL10.WP2.01060 |
RPL10.Conn CorpNet & FacNet Live | WP2 (GS/CARRIER/SFZ - INF, CAB [ISP/OSP], NET) | Not Started | 06/08/26 | 06/08/26 | 0.0 | 0.0 |
|
56.2 |
RPL10.WP4.027500 |
RPL10.Conn NS1.CFD5.48<>21-25 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] | Prefab | Not Started | 06/08/26 | 06/11/26 | 5.0 | 5.0 |
|
136.2 |
RPL10.WP4.027700 |
RPL10.Conn NS1.CFD4.48<>21-25 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] | Prefab | Not Started | 06/08/26 | 06/11/26 | 5.0 | 5.0 |
|
136.2 |
RPL10.WP4.028500 |
RPL10.Conn NS2.CFD6.48<>21-25 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] | Prefab | Not Started | 06/08/26 | 06/11/26 | 5.0 | 5.0 |
|
147.5 |
RPL10.WP4.028700 |
RPL10.Conn NS2.CFD5.48<>21-25 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] | Prefab | Not Started | 06/08/26 | 06/11/26 | 5.0 | 5.0 |
|
147.5 |
RPL10.WP4.028820 |
RPL10.Conn NS2.CFD4.48<>03-05 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] | Prefab | Not Started | 06/08/26 | 06/09/26 | 2.5 | 2.5 |
|
130.0 |
RPL10.WP4.NS2.01640 |
RPL10.Conn NS2.CFD4 Network - WBS Summary | Network | Not Started | 06/08/26 | 11/10/26 | 137.5 | 137.5 |
|
60.0 |
DCC.B10.3557 |
[NWB] Cabling Start : Front End Production Cabling [NWS 4] | Connectivity | Not Started | 06/09/26 | 06/09/26 | 0.0 | 0.0 |
|
866.2 |
DCC.B10.3559 |
[NWB] Cabling Start : Back End Production Cabling [NWS 4] | Connectivity | Not Started | 06/09/26 | 06/09/26 | 0.0 | 0.0 |
|
866.2 |
GCD.RPL10.3528 |
[RPL10] TC Ready: Production Cabling Pathways Complete [NS1 Rows 9-16] | TC Ready: Production Cabling - NS1 | Not Started | 06/09/26 | 06/09/26 | 0.0 | 0.0 |
|
36.2 |
GCD.RPL10.5825 |
RMU Loop Ready for Energization - NS2 Loop 2 | EY | Not Started | 06/09/26 | 06/09/26 | 0.0 | 0.0 |
|
62.5 |
RPL.10.D.X3730.XG |
RMUs/MV Skids Set (Loop 1) - RPL10 NS4 | Give Milestones (XREFs) | Not Started | 06/09/26 | 06/09/26 | 0.0 | 0.0 |
|
865.0 |
RPL.10.D.X3735.XG |
RMUs/MV Skids Set (Loop 2) - RPL10 NS4 | Give Milestones (XREFs) | Not Started | 06/09/26 | 06/09/26 | 0.0 | 0.0 |
|
865.0 |
RPL10.EY.NS2.01340 |
RPL10.EY.NS2 - Install Lighting | Hardscape and Landscape | Not Started | 06/09/26 | 06/22/26 | 12.5 | 12.5 |
|
181.2 |
RPL10.INT.EF1.01270 |
RPL10.Interior.EF1 - North CRAH Gallery - Pull EPMS / BMS from panel to devices | North CRAH Gallery | Not Started | 06/09/26 | 06/15/26 | 6.2 | 6.2 |
|
110.0 |
RPL10.INT.EF1.01280 |
RPL10.Interior.EF1 - North CRAH Gallery - Fire Life Safety | North CRAH Gallery | Not Started | 06/09/26 | 06/15/26 | 6.2 | 6.2 |
|
177.5 |
RPL10.INT.EF1.01290 |
RPL10.Interior.EF1 - North CRAH Gallery - Install copper from GS.IDF to BMS and EPMS panels | North CRAH Gallery | Not Started | 06/09/26 | 06/15/26 | 6.2 | 6.2 |
|
110.0 |
RPL10.INT.EF1.01340 |
RPL10.Interior.EF1 - South CRAH Gallery - Pull EPMS / BMS from panel to devices | South CRAH Gallery | Not Started | 06/09/26 | 06/15/26 | 6.2 | 6.2 |
|
110.0 |
RPL10.INT.EF1.01350 |
RPL10.Interior.EF1 - South CRAH Gallery - Fire Life Safety | South CRAH Gallery | Not Started | 06/09/26 | 06/15/26 | 6.2 | 6.2 |
|
177.5 |
RPL10.INT.EF1.01360 |
RPL10.Interior.EF1 - South CRAH Gallery - Install copper from GS.IDF to BMS and EPMS panels | South CRAH Gallery | Not Started | 06/09/26 | 06/15/26 | 6.2 | 6.2 |
|
110.0 |
RPL10.INT.EF1.01520 |
RPL10.Interior.EF1 - EF1 West - Pull EPMS / BMS from panel to devices | West EF-1 | Not Started | 06/09/26 | 06/15/26 | 6.2 | 6.2 |
|
110.0 |
RPL10.INT.EF1.01530 |
RPL10.Interior.EF1 - EF1 West - Install copper from GS.IDF to BMS and EPMS panels | West EF-1 | Not Started | 06/09/26 | 06/15/26 | 6.2 | 6.2 |
|
110.0 |
RPL10.INT.EF1.01540 |
RPL10.Interior.EF1 - EF1 West - Fire Life Safety | West EF-1 | Not Started | 06/09/26 | 06/17/26 | 8.8 | 8.8 |
|
175.0 |
RPL10.INT.EF1.01610 |
RPL10.Interior.EF1 - North CRAH Gallery - Piping Tie-ins FW (In Gallery #3 CRAH Units) | North CRAH Gallery | Not Started | 06/09/26 | 06/19/26 | 11.2 | 11.2 |
|
87.5 |
RPL10.INT.NS2.01200 |
RPL10.Conn NS2.CFD6 - Set Passive Racks for WP3B | Infrastructure | Not Started | 06/09/26 | 06/11/26 | 3.8 | 3.8 |
|
40.0 |
RPL10.INT.NS2.01390 |
RPL10.Interior.NS2 - Control Fault Domain 5 SQ2.2 - Install Copper from GS.IDF to BMS and EPMS panels | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/09/26 | 07/07/26 | 25.0 | 25.0 |
|
18.8 |
RPL10.INT.NS2.01410 |
RPL10.Interior.NS2 - Control Fault Domain 4 SQ3.2 - Install Vesda / FA | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/09/26 | 07/07/26 | 25.0 | 25.0 |
|
22.5 |
RPL10.INT.NS2.01420 |
RPL10.Interior.NS2 - Control Fault Domain 4 SQ3.2 - Install FW | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/09/26 | 07/07/26 | 25.0 | 25.0 |
|
16.2 |
RPL10.INT.NS2.02220 |
RPL10.Interior.NS2 - Control Fault Domain 4 SQ3.2 - Install TW | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/09/26 | 07/07/26 | 25.0 | 25.0 |
|
16.2 |
RPL10.INT.NS2.02845 |
RPL10.Interior.NS2 - Control Fault Domain 4 SQ3.2 - Install Duct (MES Side) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/09/26 | 07/07/26 | 25.0 | 25.0 |
|
16.2 |
RPL10.INT.NS2.02925 |
RPL10.Conn NS2.CFD6 - Set Passive Racks for PON | Infrastructure | Not Started | 06/09/26 | 06/11/26 | 3.8 | 3.8 |
|
161.2 |
RPL10.INT.NS3.01113 |
RPL10.Interior.NS3 - MES Skids - CDU Tie-Ins | NS3 - MES Skids | Not Started | 06/09/26 | 07/13/26 | 30.0 | 30.0 |
|
240.0 |
RPL10.INT.NS3.01210 |
RPL10.Interior.NS3 - OFE - Control Fault Domain 2 SQ8.2 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary | OFE NS3 Control Fault Domain 2 | Not Started | 06/09/26 | 09/30/26 | 100.0 | 100.0 |
|
3.8 |
RPL10.INT.NS3.01250 |
RPL10.Interior.NS3 - Control Fault Domain 1 SQ7.2 - Install LV Side Aisle Cable Tray | LV Side Tie-ins | Not Started | 06/09/26 | 06/15/26 | 6.2 | 6.2 |
|
121.2 |
RPL10.INT.NS3.02560 |
RPL10.Interior.NS3 - OFE - Control Fault Domain 2 SQ8.2 (LV Side Aisle) | OFE NS3 Control Fault Domain 2 | Not Started | 06/09/26 | 06/12/26 | 5.0 | 5.0 |
|
88.8 |
RPL10.INT.NS4.01530 |
RPL10.Interior.NS4 - Control Fault Domain 3 SQ9.1 - Install LV Side Aisle Cable Tray | LV Side Tie-ins | Not Started | 06/09/26 | 06/12/26 | 5.0 | 5.0 |
|
176.2 |
RPL10.INT.SSB.03040 |
RPL10.SKIN.SSB - Install Metal Canopy | Glazing, Doors and Ext Devices | Not Started | 06/09/26 | 06/10/26 | 2.5 | 2.5 |
|
155.0 |
RPL10.MCUP.LP2.2400 |
RPL10.MCUP.Loop 2 - Install Bollards | Hardscape and Landscape | Not Started | 06/09/26 | 06/17/26 | 8.8 | 8.8 |
|
462.5 |
RPL10.SKN.SSB.01410 |
RPL10.SKIN.BLDG - Install Lightning Protection | Skin | Not Started | 06/09/26 | 06/15/26 | 6.2 | 6.2 |
|
307.5 |
RPL10.SSB.BB.1960 |
RPL10.Ext.Build Back.SSB - LO #5 - Final Punch Walk | Build Back Exterior Leave Out Wall #5 (East SSB) | Not Started | 06/09/26 | 06/10/26 | 2.5 | 2.5 |
|
437.5 |
RPL10.WP2.GSIDF.1740 |
RPL10.Conn GSIDFN43 Install & Test Network (FIM) | Network | Not Started | 06/09/26 | 06/11/26 | 3.8 | 3.8 |
|
208.8 |
RPL10.WP2.GSIDF.1980 |
RPL10.Conn GSIDFN33 Install & Test Network (FIM) | Network | Not Started | 06/09/26 | 06/11/26 | 3.8 | 3.8 |
|
208.8 |
RPL10.WP2.GSIDF.2340 |
RPL10.Conn IDF Huts - (GSMDF to GSIDF) SSB NX05 WBS Summary | GSIDFNX05 | Not Started | 06/09/26 | 06/25/26 | 16.2 | 16.2 |
|
455.0 |
RPL10.WP2.GSIDF.2360 |
RPL10.Conn GSIDFNX05 Set Infrastructure (Racks, Waterfalls etc.) | Infrastructure | Not Started | 06/09/26 | 06/15/26 | 6.2 | 6.2 |
|
196.2 |
RPL10.WP2.GSIDF.2480 |
RPL10.Conn GSIDFNX06 Install & Test Network (FIM) | Network | Not Started | 06/09/26 | 06/11/26 | 3.8 | 3.8 |
|
208.8 |
RPL10.WP2.GSIDF.2550 |
RPL10.Conn GSIDFNX07 Install & Test Network (FIM) | Network | Not Started | 06/09/26 | 06/11/26 | 3.8 | 3.8 |
|
208.8 |
RPL10.WP2.GSIDF.3200 |
RPL10.Conn GSIDFN43 Install Copper, WAPs, Security Camera & Access Control | Cabling | Not Started | 06/09/26 | 06/24/26 | 15.0 | 15.0 |
|
456.2 |
RPL10.WP2.GSIDF.3260 |
RPL10.Conn GSIDFN33 Install Copper, WAPs, Security Camera & Access Control | Cabling | Not Started | 06/09/26 | 06/24/26 | 15.0 | 15.0 |
|
456.2 |
RPL10.WP2.GSIDF.3380 |
RPL10.Conn GSIDFNX06 Install Copper, WAPs, Security Camera & Access Control | Cabling | Not Started | 06/09/26 | 06/11/26 | 3.8 | 3.8 |
|
467.5 |
RPL10.WP2.GSIDF.3400 |
RPL10.Conn GSIDFNX07 Install Copper, WAPs, Security Camera & Access Control | Cabling | Not Started | 06/09/26 | 06/11/26 | 3.8 | 3.8 |
|
467.5 |
RPL10.WP3A.EF.03000 |
RPL10.Conn EF1B Infrastructure - WBS Summary | Infrastructure & Cabling | Not Started | 06/09/26 | 07/21/26 | 37.5 | 37.5 |
|
183.8 |
RPL10.WP3A.EF.03020 |
RPL10.Conn EF1B Infrasturcture 1 (Racks & Vertical Cable Manager,Ladder Racks) | Infrastructure & Cabling | Not Started | 06/09/26 | 07/07/26 | 25.0 | 25.0 |
|
121.2 |
RPL10.WP3A.EF.04000 |
RPL10.Conn EF1B OSP Pathway - WBS Summary | Infrastructure & Cabling | Not Started | 06/09/26 | 07/21/26 | 37.5 | 37.5 |
|
183.8 |
RPL10.WP4.027300 |
RPL10.Conn NS1.CFD6.48<>21-25 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] | Prefab | Not Started | 06/09/26 | 06/12/26 | 5.0 | 5.0 |
|
135.0 |
RPL10.WP4.027840 |
RPL10.Conn NS1.CFD3.48<>06-10 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] | Prefab | Not Started | 06/09/26 | 06/11/26 | 3.8 | 3.8 |
|
120.0 |
RPL10.WP4.08840 |
RPL10.Conn NS2.CFD6 Pull/Install Ext. Trunk (384F) [JXSW<>MA] | [MA<>JXSW] | Not Started | 06/09/26 | 06/16/26 | 7.5 | 7.5 |
|
188.8 |
RPL10.WP4.NS2.01040 |
RPL10.Conn NS2.CFD6 Infrastructure - WBS Summary | Infrastructure | Not Started | 06/09/26 | 06/22/26 | 12.5 | 12.5 |
|
71.2 |
RPL10.WP4.NS2.01060 |
RPL10.Conn NS2.CFD6 Infrastructure | Infrastructure | Not Started | 06/09/26 | 06/22/26 | 12.5 | 12.5 |
|
71.2 |
RPL10.EY.EF1.01230 |
RPL10.EY.EF1 - Install RPL-2 FSP Grounding Wire | Fiber Support Platform - RPL-2 | Not Started | 06/10/26 | 06/11/26 | 2.5 | 2.5 |
|
255.0 |
RPL10.EY.EF1.01420 |
RPL10.EY.EF1 - Install RPL-2 FSP Interior Hilti Support & Cable Trays | Fiber Support Platform - RPL-2 | Not Started | 06/10/26 | 06/25/26 | 15.0 | 15.0 |
|
242.5 |
RPL10.EY.EF1.01720 |
RPL10.EY.EF1 - Install RPL-2 FSP Final Roof (Standing Seam Panels) Phase 2 | Fiber Support Platform - RPL-2 | Not Started | 06/10/26 | 06/16/26 | 6.2 | 6.2 |
|
242.5 |
RPL10.EY.NS4.01240 |
RPL10.EY.NS4 - Install GS.IDF Hut (1x GS.IDF) NX03 (05.29.26) | OFE | Not Started | 06/10/26 | 06/16/26 | 6.2 | 6.2 |
|
107.5 |
RPL10.EY.NS4.01250 |
RPL10.EY.NS4 - Install Electrical Tie-ins (include penetration detail) | Tie-ins | Not Started | 06/10/26 | 06/23/26 | 12.5 | 12.5 |
|
107.5 |
RPL10.EY.NS4.01260 |
RPL10.EY.NS4 - Tie-ins - WBS Summary | Tie-ins | Not Started | 06/10/26 | 07/29/26 | 43.8 | 43.8 |
|
165.0 |
RPL10.INT.EF2.01460 |
RPL10.Interior.EF2 - EF2 East - Set Passive Panels / Racks | East EF-2 | Not Started | 06/10/26 | 06/16/26 | 6.2 | 6.2 |
|
187.5 |
RPL10.INT.NS1.01420 |
RPL10.Conn NS1.CFD5 - Set Passive Racks for WP3B | Infrastructure | Not Started | 06/10/26 | 06/12/26 | 3.8 | 3.8 |
|
32.5 |
RPL10.INT.NS1.02860 |
RPL10.Conn NS1.CFD5 - Set Passive Racks for PON | Infrastructure | Not Started | 06/10/26 | 06/12/26 | 3.8 | 3.8 |
|
148.8 |
RPL10.INT.NS4.01550 |
RPL10.Interior.NS4 - Control Fault Domain 4 SQ10.1 - Install Duct (LV Side) | LV Side Tie-ins | Not Started | 06/10/26 | 06/15/26 | 5.0 | 5.0 |
|
162.5 |
RPL10.INT.NS4.01580 |
RPL10.Interior.NS4 - Tie-ins - Control Fault Domain 4 SQ10.1 - WBS Summary | Tie-Ins NS4 Control Fault Domain 4 | Not Started | 06/10/26 | 11/13/26 | 137.5 | 137.5 |
|
78.8 |
RPL10.INT.SSB.01570 |
RPL10.Interior.SSB - Loading Dock and Storage - Electrical L2 Checklist Completion | Loading Dock and Storage | Not Started | 06/10/26 | 06/23/26 | 12.5 | 12.5 |
|
173.8 |
RPL10.INT.SSB.02960 |
RPL10.Interior.SSB - Loading Dock and Storage - Install Flooring / Carpet Tile | Loading Dock and Storage | Not Started | 06/10/26 | 06/16/26 | 6.2 | 6.2 |
|
178.8 |
RPL10.OFCI.6920 |
OFCI - Delivery ROJ: FE Fiber for CFD NS1.1 (ROJ ) (RVCD ) | NS1 | Not Started | 06/10/26 | 06/30/26 | 18.8 | 18.8 |
|
97.5 |
RPL10.WP4.01220 |
RPL10.Conn NS1.CFD5.09 Pull Duplex Jumper (LC<>LC) [MA<>JXSW] | Pull Duplex Jumper [MA<>JXSW] | Not Started | 06/10/26 | 06/12/26 | 3.8 | 3.8 |
|
146.2 |
RPL10.WP4.028840 |
RPL10.Conn NS2.CFD4.48<>06-10 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] | Prefab | Not Started | 06/10/26 | 06/12/26 | 3.8 | 3.8 |
|
130.0 |
RPL10.WP4.NS1.02440 |
RPL10.Conn NS1.CFD5 Infrastructure - WBS Summary | Infrastructure | Not Started | 06/10/26 | 06/15/26 | 5.0 | 5.0 |
|
51.2 |
RPL10.WP4.NS1.02460 |
RPL10.Conn NS1.CFD5 Infrastructure | Infrastructure | Not Started | 06/10/26 | 06/15/26 | 5.0 | 5.0 |
|
51.2 |
RPL.GF.D.N0105.XG |
GS.EF2 Infrastructure Ready RPL10 | Give Milestones (XREFs) | Not Started | 06/11/26 | 06/11/26 | 0.0 | 0.0 |
|
862.5 |
RPL.GF.D.N0290.XR |
Fiber Pulls, Test & Term All Prod EF to EF Complete RPL 10 to AI2 | Connectivity (XREFs) | Not Started | 06/11/26 | 06/11/26 | 0.0 | 0.0 |
|
156.2 |
RPL10.CTRC.BB.3495 |
RPL10.Int.Build Back.Center-Corr - LO #8 - Tape, Float and Paint | Build Back Interior Leave Out Wall #6 #8 (Center Corr) | Not Started | 06/11/26 | 06/17/26 | 6.2 | 6.2 |
|
142.5 |
RPL10.CTRC.BB.3515 |
RPL10.Int.Build Back.Center-Corr - LO #7 - Install Remaining Hilti Steel | Build Back Interior Leave Out Wall #7, #7B #9 (Center Corr) | Not Started | 06/11/26 | 06/15/26 | 3.8 | 3.8 |
|
147.5 |
RPL10.CTRC.BB.3655 |
RPL10.Int.Build Back.Center-Corr - LO #9 - MEPF - In Wall | Build Back Interior Leave Out Wall #7, #7B #9 (Center Corr) | Not Started | 06/11/26 | 06/15/26 | 3.8 | 3.8 |
|
141.2 |
RPL10.INT.NS3.01270 |
RPL10.Interior.NS3 - Control Fault Domain 2 SQ8.2 - Install Duct (LV Side) | LV Side Tie-ins | Not Started | 06/11/26 | 06/16/26 | 5.0 | 5.0 |
|
91.2 |
RPL10.INT.NS3.01300 |
RPL10.Interior.NS3 - Tie-ins - Control Fault Domain 2 SQ8.2 - WBS Summary | Tie-Ins NS3 Control Fault Domain 2 | Not Started | 06/11/26 | 11/16/26 | 137.5 | 137.5 |
|
51.2 |
RPL10.INT.SSBC.01430 |
RPL10.Interior.SSB-Corridor - BoW - Final Punch Walk | Balance of Walls & OverHead | Not Started | 06/11/26 | 06/12/26 | 2.5 | 2.5 |
|
123.8 |
RPL10.WP4.NS1.01040 |
RPL10.Conn NS1.CFD6 Infrastructure - WBS Summary | Infrastructure | Not Started | 06/11/26 | 06/16/26 | 5.0 | 5.0 |
|
70.0 |
RPL10.WP4.NS1.01060 |
RPL10.Conn NS1.CFD6 Infrastructure | Infrastructure | Not Started | 06/11/26 | 06/16/26 | 5.0 | 5.0 |
|
70.0 |
RPL10.CX.CTRC.01000 |
RPL10.CX.Center COR - L3, L4, IST - WBS Summary | Center Corridor | Not Started | 06/12/26 | 08/21/26 | 62.5 | 62.5 |
|
125.0 |
RPL10.CX.CTRC.01010 |
RPL10.CX.Center COR - L3 | Center Corridor | Not Started | 06/12/26 | 07/24/26 | 37.5 | 37.5 |
|
125.0 |
RPL10.INT.CTRC.01470 |
RPL10.Interior.Center-Corridor - BoW - Final Clean | Balance of Walls & OverHead | Not Started | 06/12/26 | 06/17/26 | 5.0 | 5.0 |
|
180.0 |
RPL10.INT.CTRC.01510 |
RPL10.Interior.Center-Corridor - BoW - Remaining L2 Checklist Completion | Balance of Walls & OverHead | Not Started | 06/12/26 | 06/18/26 | 6.2 | 6.2 |
|
162.5 |
RPL10.INT.NS4.01630 |
RPL10.Interior.NS4 - OFE - Control Fault Domain 5 SQ11.1 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary | OFE NS4 Control Fault Domain 5 | Not Started | 06/12/26 | 10/20/26 | 113.8 | 113.8 |
|
66.2 |