Schedule Viewer
Last schedule upload: D3-R25005-00-RPL10 — 8463 activities — 05/05/2026 09:13 AM CT
RPL10 - GC LIVE SCHEDULE - Data Date 20260426.xer
· Uploaded May 05, 2026 02:13 PM
· 8463 activities
Experimental
Auto-populate checklist dates from schedule:
100
Activities Shown
0
Completed
0
In Progress
0
Critical
| Activity ID | Activity Name | WBS | Status | Start | Finish | Dur (d) | Rem (d) | % Comp | Float (d) |
|---|---|---|---|---|---|---|---|---|---|
RPL10.INT.EF2.01525 |
RPL10.Interior.EF2 - EF2 West - Install Wall Mounted Ladder Racks on Full Height EF Walls | West EF-2 | Not Started | 05/18/26 | 05/22/26 | 6.2 | 6.2 |
|
218.8 |
RPL10.INT.NS1.02020 |
RPL10.Interior.NS1 - Control Fault Domain 1 SQ6.1 - Install LV Side Aisle Cable Tray | LV Side Tie-ins | Not Started | 05/18/26 | 05/21/26 | 5.0 | 5.0 |
|
135.0 |
RPL10.INT.NS2.01250 |
RPL10.Interior.NS2 - Control Fault Domain 6 SQ1.2 - Install Copper from GS.IDF to BMS and EPMS panels | Remaining Tie-ins post Mech Side Aisle install | Not Started | 05/18/26 | 06/15/26 | 25.0 | 25.0 |
|
27.5 |
RPL10.INT.NS2.01270 |
RPL10.Interior.NS2 - Control Fault Domain 5 SQ2.2 - Install Vesda / FA | Remaining Tie-ins post Mech Side Aisle install | Not Started | 05/18/26 | 06/15/26 | 25.0 | 25.0 |
|
31.2 |
RPL10.INT.NS2.01280 |
RPL10.Interior.NS2 - Control Fault Domain 5 SQ2.2 - Install FW | Remaining Tie-ins post Mech Side Aisle install | Not Started | 05/18/26 | 06/15/26 | 25.0 | 25.0 |
|
18.8 |
RPL10.INT.NS2.01780 |
RPL10.Interior.NS2 - Control Fault Domain 2 SQ5.2 - Install LV Side Aisle HAC Busway | LV Side Tie-ins | Not Started | 05/18/26 | 05/21/26 | 5.0 | 5.0 |
|
87.5 |
RPL10.INT.NS2.02200 |
RPL10.Interior.NS2 - Control Fault Domain 5 SQ2.2 - Install TW | Remaining Tie-ins post Mech Side Aisle install | Not Started | 05/18/26 | 06/15/26 | 25.0 | 25.0 |
|
18.8 |
RPL10.INT.NS2.02825 |
RPL10.Interior.NS2 - Control Fault Domain 5 SQ2.2 - Install Duct (MES Side) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 05/18/26 | 06/15/26 | 25.0 | 25.0 |
|
18.8 |
RPL10.MCUP.LP1.2500 |
RPL10.MCUP.Loop 1 - Install Bollards | Hardscape and Landscape | Not Started | 05/18/26 | 06/01/26 | 12.5 | 12.5 |
|
452.5 |
RPL10.MCUP.LP2.1640 |
RPL10.MCUP.Loop 2 - Install Site Grading for Paving *Start 05/08 | Hardscape and Landscape | Not Started | 05/18/26 | 06/08/26 | 18.8 | 18.8 |
|
452.5 |
RPL10.SKN.SSB.01070 |
RPL10.SKIN.SSB - Install Security | Glazing, Doors and Ext Devices | Not Started | 05/18/26 | 05/19/26 | 2.5 | 2.5 |
|
173.8 |
RPL10.WP2.01040 |
RPL10.Conn SSB - Construction Cx Server Ready - At mCup | WP2 (GS/CARRIER/SFZ - INF, CAB [ISP/OSP], NET) | Not Started | 05/18/26 | 05/18/26 | 0.0 | 0.0 |
|
22.5 |
RPL10.WP2.GSIDF.1580 |
RPL10.Conn GSIDFN41 Install & Test Network (FIM) | Network | Not Started | 05/18/26 | 05/20/26 | 3.8 | 3.8 |
|
227.5 |
RPL10.WP2.GSIDF.1680 |
RPL10.Conn IDF Huts - (GSMDF to GSIDF) NS4 N43 WBS Summary | GSIDFN43 | Not Started | 05/18/26 | 06/24/26 | 33.8 | 33.8 |
|
456.2 |
RPL10.WP2.GSIDF.1700 |
RPL10.Conn GSIDFN43 Set Infrastructure (Racks, Waterfalls etc.) | Infrastructure | Not Started | 05/18/26 | 05/22/26 | 6.2 | 6.2 |
|
208.8 |
RPL10.WP2.GSIDF.1820 |
RPL10.Conn GSIDFN31 Install & Test Network (FIM) | Network | Not Started | 05/18/26 | 05/20/26 | 3.8 | 3.8 |
|
227.5 |
RPL10.WP2.GSIDF.1920 |
RPL10.Conn IDF Huts - (GSMDF to GSIDF) NS3 N33 WBS Summary | GSIDFN33 | Not Started | 05/18/26 | 06/24/26 | 33.8 | 33.8 |
|
456.2 |
RPL10.WP2.GSIDF.1940 |
RPL10.Conn GSIDFN33 Set Infrastructure (Racks, Waterfalls etc.) | Infrastructure | Not Started | 05/18/26 | 05/22/26 | 6.2 | 6.2 |
|
208.8 |
RPL10.WP2.GSIDF.2860 |
RPL10.Conn GSIDFNX11 Install & Test Network (FIM) | Network | Not Started | 05/18/26 | 05/20/26 | 3.8 | 3.8 |
|
227.5 |
RPL10.WP2.GSIDF.2940 |
RPL10.Conn GSIDFNX12 Install & Test Network (FIM) | Network | Not Started | 05/18/26 | 05/20/26 | 3.8 | 3.8 |
|
227.5 |
RPL10.WP2.GSIDF.3160 |
RPL10.Conn GSIDFN41 Install Copper, WAPs, Security Camera & Access Control | Cabling | Not Started | 05/18/26 | 06/03/26 | 15.0 | 15.0 |
|
300.0 |
RPL10.WP2.GSIDF.3220 |
RPL10.Conn GSIDFN31 Install Copper, WAPs, Security Camera & Access Control | Cabling | Not Started | 05/18/26 | 06/03/26 | 15.0 | 15.0 |
|
300.0 |
RPL10.WP2.GSIDF.3480 |
RPL10.Conn GSIDFNX11 Install Copper, WAPs, Security Camera & Access Control | Cabling | Not Started | 05/18/26 | 05/20/26 | 3.8 | 3.8 |
|
486.2 |
RPL10.WP2.GSIDF.3500 |
RPL10.Conn GSIDFNX12 Install Copper, WAPs, Security Camera & Access Control | Cabling | Not Started | 05/18/26 | 06/01/26 | 12.5 | 12.5 |
|
477.5 |
RPL10.WP4.027220 |
RPL10.Conn NS1.CFD6.48<>03-05 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] | Prefab | Not Started | 05/18/26 | 05/20/26 | 3.8 | 3.8 |
|
135.0 |
RPL10.WP4.027420 |
RPL10.Conn NS1.CFD5.48<>03-05 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] | Prefab | Not Started | 05/18/26 | 05/19/26 | 2.5 | 2.5 |
|
136.2 |
RPL10.WP4.027620 |
RPL10.Conn NS1.CFD4.48<>03-05 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] | Prefab | Not Started | 05/18/26 | 05/19/26 | 2.5 | 2.5 |
|
136.2 |
RPL10.WP4.028420 |
RPL10.Conn NS2.CFD6.48<>03-05 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] | Prefab | Not Started | 05/18/26 | 05/19/26 | 2.5 | 2.5 |
|
147.5 |
RPL10.WP4.028620 |
RPL10.Conn NS2.CFD5.48<>03-05 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] | Prefab | Not Started | 05/18/26 | 05/19/26 | 2.5 | 2.5 |
|
147.5 |
RPL10.WP4.NS1.01800 |
RPL10.Conn NS1.CFD6 Network - WBS Summary | Network | Not Started | 05/18/26 | 11/06/26 | 152.5 | 152.5 |
|
51.2 |
RPL10.WP4.NS1.02480 |
RPL10.Conn NS1.CFD5 Network - WBS Summary | Network | Not Started | 05/18/26 | 11/10/26 | 155.0 | 155.0 |
|
48.8 |
RPL10.WP4.NS1.02720 |
RPL10.Conn NS1.CFD4 Network - WBS Summary | Network | Not Started | 05/18/26 | 11/13/26 | 157.5 | 157.5 |
|
46.2 |
RPL10.WP4.NS2.01080 |
RPL10.Conn NS2.CFD6 Network - WBS Summary | Network | Not Started | 05/18/26 | 11/19/26 | 162.5 | 162.5 |
|
52.5 |
RPL10.WP4.NS2.02220 |
RPL10.Conn NS2.CFD5 Network - WBS Summary | Network | Not Started | 05/18/26 | 11/06/26 | 152.5 | 152.5 |
|
62.5 |
DCC.B10.3527 |
[NWB] Cabling Start : Front End Production Cabling [NWS 1] | Connectivity | Not Started | 05/19/26 | 05/19/26 | 0.0 | 0.0 |
|
883.8 |
DCC.B10.3529 |
[NWB] Cabling Start : Back End Production Cabling [NWS 1] | Connectivity | Not Started | 05/19/26 | 05/19/26 | 0.0 | 0.0 |
|
883.8 |
JCL.C.1380 |
RPL10 - Cost Risk LOE-19 Connectivity Package 3A - Front End Infra & Cabling (OSP,OH) | Cost LOEs | Not Started | 05/19/26 | 08/26/26 | 87.5 | 87.5 |
|
121.2 |
RPL10.EY.EF1.01240 |
RPL10.EY.EF1 - Install RPL-2 Total Road Closure For Fiber Supprt Platform | Fiber Support Platform - RPL-2 | Not Started | 05/19/26 | 07/29/26 | 62.5 | 62.5 |
|
223.8 |
RPL10.EY.EF1.01270 |
RPL10.EY.EF1 - Install RPL-1 FSP Floor Grating | Fiber Support Platform - RPL-1 | Not Started | 05/19/26 | 06/02/26 | 12.5 | 12.5 |
|
248.8 |
RPL10.EY.EF1.01280 |
RPL10.EY.EF1 - Install RPL-2 FSP Install Steel Span Structure Modules | Fiber Support Platform - RPL-2 | Not Started | 05/19/26 | 06/02/26 | 12.5 | 12.5 |
|
201.2 |
RPL10.EY.NS1.01330 |
RPL10.EY.NS1 - Install Early EY Paving | Hardscape and Landscape | Not Started | 05/19/26 | 05/26/26 | 6.2 | 6.2 |
|
181.2 |
RPL10.EY.NS3.01220 |
RPL10.EY.NS3 - Install MV, RMUs & Electrical Panels (15) | OFE | Not Started | 05/19/26 | 06/16/26 | 25.0 | 25.0 |
|
101.2 |
RPL10.EY.NS3.01230 |
RPL10.EY.NS3 - OFE - MV - WBS Summary | OFE | Not Started | 05/19/26 | 07/08/26 | 43.8 | 43.8 |
|
108.8 |
RPL10.INT.EF1.01430 |
RPL10.Interior.EF1 - EF1 East - Pull EPMS / BMS from panel to devices | East EF-1 | Not Started | 05/19/26 | 05/26/26 | 6.2 | 6.2 |
|
127.5 |
RPL10.INT.EF1.01440 |
RPL10.Interior.EF1 - EF1 East - Install copper from GS.IDF to BMS and EPMS panels | East EF-1 | Not Started | 05/19/26 | 05/26/26 | 6.2 | 6.2 |
|
127.5 |
RPL10.INT.EF1.01450 |
RPL10.Interior.EF1 - EF1 East - Fire Life Safety | East EF-1 | Not Started | 05/19/26 | 05/28/26 | 8.8 | 8.8 |
|
192.5 |
RPL10.INT.NS1.01480 |
RPL10.Interior.NS1 - Control Fault Domain 5 SQ2.1 - Install copper from GS.IDF to BMS and EPMS panels | Remaining Tie-ins post Mech Side Aisle install | Not Started | 05/19/26 | 06/16/26 | 25.0 | 25.0 |
|
42.5 |
RPL10.INT.NS2.01800 |
RPL10.Interior.NS2 - Control Fault Domain 2 SQ5.2 - Install LV Side Aisle Cable Tray | LV Side Tie-ins | Not Started | 05/19/26 | 05/22/26 | 5.0 | 5.0 |
|
131.2 |
RPL10.INT.NS4.01120 |
RPL10.Interior.NS4 - OFE - Control Fault Domain 1 SQ7.1 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary | OFE NS4 Control Fault Domain 1 | Not Started | 05/19/26 | 08/24/26 | 85.0 | 85.0 |
|
43.8 |
RPL10.INT.NS4.02480 |
RPL10.Interior.NS4 - OFE - Control Fault Domain 1 SQ7.1 (LV Side Aisle) | OFE NS4 Control Fault Domain 1 | Not Started | 05/19/26 | 05/26/26 | 6.2 | 6.2 |
|
110.0 |
RPL10.SSB.BB.1200 |
RPL10.Ext.Build Back.SSB - LO #5 - MEPF Trim Out | Build Back Exterior Leave Out Wall #5 (East SSB) | Not Started | 05/19/26 | 06/02/26 | 12.5 | 12.5 |
|
437.5 |
RPL10.WP2.CMDF1.1100 |
RPL10.Conn CMDF1 Includes Rack/ Stack/ Patch | Network | Not Started | 05/19/26 | 05/21/26 | 3.8 | 3.8 |
|
162.5 |
RPL10.WP2.GSIDF.2060 |
RPL10.Conn GSIDFNX01 Install Cabling (Pull, Splice & terminate) | Cabling | Not Started | 05/19/26 | 05/26/26 | 6.2 | 6.2 |
|
220.0 |
RPL10.WP2.GSIDF.2140 |
RPL10.Conn GSIDFNX02 Install Cabling (Pull, Splice & terminate) | Cabling | Not Started | 05/19/26 | 05/26/26 | 6.2 | 6.2 |
|
22.5 |
RPL10.WP3A.EF.01020 |
RPL10.Conn EF1F Infrasturcture 1 (Racks & Vertical Cable Manager, Ladder Racks) | Infrastructure & Cabling | Not Started | 05/19/26 | 06/16/26 | 25.0 | 25.0 |
|
113.8 |
RPL10.WP3A.EF.02000 |
RPL10.Conn EF1F OSP Pathway - WBS Summary | Infrastructure & Cabling | Not Started | 05/19/26 | 06/30/26 | 37.5 | 37.5 |
|
201.2 |
RPL.CM.D.N5635.XR |
US 80 Turn Lane at Bypass Rd | Logistics - Off-Site Receive XREF Milsetones | Not Started | 05/20/26 | 05/20/26 | 0.0 | 0.0 |
|
128.8 |
RPL10.CTRC.BB.3575 |
RPL10.Int.Build Back.Center-Corr - LO #7B - MEPF - In Wall | Build Back Interior Leave Out Wall #7, #7B #9 (Center Corr) | Not Started | 05/20/26 | 05/22/26 | 3.8 | 3.8 |
|
160.0 |
RPL10.EY.EF1.01360 |
RPL10.EY.EF1 - Install BMS Tie-ins | Tie-ins | Not Started | 05/20/26 | 05/27/26 | 6.2 | 6.2 |
|
126.2 |
RPL10.EY.EF2.01220 |
RPL10.EY.EF2 - Install RPL-3 Total Road Closure For Fiber Supprt Platform | Fiber Support Platform - RPL-3 | Not Started | 05/20/26 | 07/30/26 | 62.5 | 62.5 |
|
235.0 |
RPL10.EY.EF2.01650 |
RPL10.EY.EF2 - Remaining L2 Checklist Completion | Tie-ins | Not Started | 05/20/26 | 05/27/26 | 6.2 | 6.2 |
|
182.5 |
RPL10.EY.EF2.01850 |
RPL10.EY.EF2 - Install RPL-3 FSP Columns Cap Cure | Fiber Support Platform - RPL-3 | Not Started | 05/20/26 | 06/09/26 | 17.5 | 17.5 |
|
195.0 |
RPL10.EY.EF2.01910 |
RPL10.EY.EF2 - Install RPL-5 FSP Columns Cap Erect Shoring & Decking & F/R/P (DPR Side) | Fiber Support Platform - RPL-5 | Not Started | 05/20/26 | 05/22/26 | 3.8 | 3.8 |
|
215.0 |
RPL10.INT.CTRC.01360 |
RPL10.Interior.Center-Corridor - BoW - Install Flooring Tiles / Resinous Flooring in specific rooms | Balance of Walls & OverHead | Not Started | 05/20/26 | 05/22/26 | 3.8 | 3.8 |
|
187.5 |
RPL10.INT.CTRC.01370 |
RPL10.Interior.Center-Corridor - BoW - Install Duct Drop Trim Out | Balance of Walls & OverHead | Not Started | 05/20/26 | 05/26/26 | 5.0 | 5.0 |
|
127.5 |
RPL10.INT.ENDC.01480 |
RPL10.Interior.End-Corridor - BoW - Tape Finish Paint BoW | Balance of Walls & Overhead | Not Started | 05/20/26 | 05/27/26 | 6.2 | 6.2 |
|
183.8 |
RPL10.INT.NS2.01920 |
RPL10.Interior.NS2 - Control Fault Domain 1 SQ6.2 - Install LV Side Aisle HAC Busway | LV Side Tie-ins | Not Started | 05/20/26 | 05/26/26 | 5.0 | 5.0 |
|
95.0 |
RPL10.WP2.CMDF1.1020 |
RPL10.Conn CMDF1 Install & Test Network (FIM) | Network | Not Started | 05/20/26 | 05/27/26 | 6.2 | 6.2 |
|
195.0 |
RPL10.WP2.CMDF2.1060 |
RPL10.Conn CMDF2 Includes Rack/ Stack/ Patch | Network | Not Started | 05/20/26 | 05/22/26 | 3.8 | 3.8 |
|
161.2 |
RPL10.WP4.027440 |
RPL10.Conn NS1.CFD5.48<>06-10 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] | Prefab | Not Started | 05/20/26 | 05/22/26 | 3.8 | 3.8 |
|
136.2 |
RPL10.WP4.027640 |
RPL10.Conn NS1.CFD4.48<>06-10 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] | Prefab | Not Started | 05/20/26 | 05/22/26 | 3.8 | 3.8 |
|
136.2 |
RPL10.WP4.028440 |
RPL10.Conn NS2.CFD6.48<>06-10 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] | Prefab | Not Started | 05/20/26 | 05/22/26 | 3.8 | 3.8 |
|
147.5 |
RPL10.WP4.028640 |
RPL10.Conn NS2.CFD5.48<>06-10 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] | Prefab | Not Started | 05/20/26 | 05/22/26 | 3.8 | 3.8 |
|
147.5 |
RPL10.INT.CTRC.01480 |
RPL10.Interior.Center-Corridor - BoW - Electrical L2 Checklist Completion | Balance of Walls & OverHead | Not Started | 05/21/26 | 06/04/26 | 12.5 | 12.5 |
|
125.0 |
RPL10.INT.EF2.01240 |
RPL10.Interior.EF2 - North CRAH Gallery - Leak Detection / Heat Trace | North CRAH Gallery | Not Started | 05/21/26 | 05/28/26 | 6.2 | 6.2 |
|
136.2 |
RPL10.INT.NS2.01930 |
RPL10.Interior.NS2 - Control Fault Domain 1 SQ6.2 - Install LV Side Aisle Cable Tray | LV Side Tie-ins | Not Started | 05/21/26 | 05/27/26 | 5.0 | 5.0 |
|
118.8 |
RPL10.INT.NS4.01130 |
RPL10.Interior.NS4 - Control Fault Domain 1 SQ7.1 - Install Duct (LV Side) | LV Side Tie-ins | Not Started | 05/21/26 | 05/28/26 | 6.2 | 6.2 |
|
122.5 |
RPL10.INT.NS4.01160 |
RPL10.Interior.NS4 - Tie-ins - Control Fault Domain 1 SQ7.1 - WBS Summary | Tie-Ins NS4 Control Fault Domain 1 | Not Started | 05/21/26 | 10/15/26 | 128.8 | 128.8 |
|
55.0 |
RPL10.INT.SSBC.01440 |
RPL10.Interior.SSB-Corridor - BoW - Electrical L2 Checklist Completion | Balance of Walls & OverHead | Not Started | 05/21/26 | 06/04/26 | 12.5 | 12.5 |
|
123.8 |
RPL10.INT.SSBC.01470 |
RPL10.Interior.SSB-Corridor - BoW - Mechanical L2 Checklist Completion | Balance of Walls & OverHead | Not Started | 05/21/26 | 06/04/26 | 12.5 | 12.5 |
|
123.8 |
RPL10.MCUP.LP2.2040 |
RPL10.MCUP.Loop 2 - Tie-in - MV Loop L2 Checklist Completion | Tie-Ins Electrical | Not Started | 05/21/26 | 06/04/26 | 12.5 | 12.5 |
|
136.2 |
RPL10.MCUP.LP2.2080 |
RPL10.MCUP.Loop 2 - Tie-in - Mechanical L2 Checklist Completion | Tie-Ins Mechanical | Not Started | 05/21/26 | 06/04/26 | 12.5 | 12.5 |
|
137.5 |
RPL10.WP2.CMDF2.1040 |
RPL10.Conn CMDF2 Install & Test Network (FIM) | Network | Not Started | 05/21/26 | 05/28/26 | 6.2 | 6.2 |
|
193.8 |
RPL10.WP4.027240 |
RPL10.Conn NS1.CFD6.48<>06-10 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] | Prefab | Not Started | 05/21/26 | 05/26/26 | 3.8 | 3.8 |
|
135.0 |
RPL10.INT.EF2.01260 |
RPL10.Interior.EF2 - Tie-ins - South CRAH Gallery - WBS Summary | South CRAH Gallery | Not Started | 05/22/26 | 06/26/26 | 31.2 | 31.2 |
|
177.5 |
RPL10.INT.EF2.01410 |
RPL10.Interior.EF2 - EF2 East - Install Lower Trays | East EF-2 | Not Started | 05/22/26 | 05/29/26 | 6.2 | 6.2 |
|
37.5 |
RPL10.INT.EF2.01420 |
RPL10.Interior.EF2 - EF2 East - Install Lighting | East EF-2 | Not Started | 05/22/26 | 06/09/26 | 15.0 | 15.0 |
|
126.2 |
RPL10.INT.EF2.01750 |
RPL10.Interior.EF2 - South CRAH Gallery - Piping Tie-ins FW (In Gallery #3 CRAH Units) | South CRAH Gallery | Not Started | 05/22/26 | 06/04/26 | 11.2 | 11.2 |
|
130.0 |
RPL10.INT.NS1.01530 |
RPL10.Interior.NS1 - Control Fault Domain 4 SQ3.1 - Pull BMS from panel to devices | Remaining Tie-ins post Mech Side Aisle install | Not Started | 05/22/26 | 06/19/26 | 25.0 | 25.0 |
|
48.8 |
RPL10.INT.NS1.01540 |
RPL10.Interior.NS1 - Control Fault Domain 4 SQ3.1 - Pull EPMS from panel to devices | Remaining Tie-ins post Mech Side Aisle install | Not Started | 05/22/26 | 06/19/26 | 25.0 | 25.0 |
|
48.8 |
RPL10.INT.NS1.01550 |
RPL10.Interior.NS1 - Control Fault Domain 4 SQ3.1 - Set UPS and Panel (2) and GS.IDF N12 | Remaining Tie-ins post Mech Side Aisle install | Not Started | 05/22/26 | 06/19/26 | 25.0 | 25.0 |
|
42.5 |
RPL10.INT.NS2.01115 |
RPL10.Interior.NS2 - MES Skids - EPMS Tie-Ins ( 2 per day) | NS2 - MES Skids | Not Started | 05/22/26 | 06/25/26 | 30.0 | 30.0 |
|
157.5 |
RPL10.INT.NS3.01092 |
RPL10.Interior.NS3 - LV Skids and TopHat - Maintenance and Reserve Busways | NS3 - LV Skids and TopHat | Not Started | 05/22/26 | 06/12/26 | 18.8 | 18.8 |
|
171.2 |
RPL10.INT.NS4.01093 |
RPL10.Interior.NS4 - LV Skids and TopHat - Top Hat Busway | NS4 - LV Skids and TopHat | Not Started | 05/22/26 | 06/12/26 | 18.8 | 18.8 |
|
165.0 |
RPL10.MCUP.LP2.2060 |
RPL10.MCUP.Loop 2 - Tie-in - Electrical L2 Checklist Completion | Tie-Ins Electrical | Not Started | 05/22/26 | 06/05/26 | 12.5 | 12.5 |
|
136.2 |
DCC.B10.3200 |
[NWB] CorpNet/Security/FacNet Ready [GS-CORE] | Connectivity | Not Started | 05/26/26 | 05/26/26 | 0.0 | 0.0 |
|
161.2 |
GCD.RPL10.1116 |
RPL10 EY Ready for Energization | Construction Milestones | Not Started | 05/26/26 | 05/26/26 | 0.0 | 0.0 |
|
181.2 |
RPL.GF.D.N0115.XR |
2 of 4 Fiber Test Complete (CAV1/4) MMH to GS.EF1/ Prod.EF1F | Connectivity (XREFs) | Not Started | 05/26/26 | 05/26/26 | 0.0 | 0.0 |
|
161.2 |
RPL.GF.D.N0140.XG |
NWB FacNet/CorpNet Live - to IBOS & Admin Building (Mortenson) | Give Milestones (XREFs) | Not Started | 05/26/26 | 05/26/26 | 0.0 | 0.0 |
|
878.8 |
RPL.GF.D.N0150.XG |
NWB FacNet/CorpNet Live - to AI Buildings (Turner) | Give Milestones (XREFs) | Not Started | 05/26/26 | 05/26/26 | 0.0 | 0.0 |
|
878.8 |