Schedule Viewer

Last schedule upload: D3-R25005-00-RPL10 — 8463 activities — 05/05/2026 09:13 AM CT
RPL10 - GC LIVE SCHEDULE - Data Date 20260426.xer · Uploaded May 05, 2026 02:13 PM · 8463 activities
Experimental Auto-populate checklist dates from schedule:
Clear
100
Activities Shown
0
Completed
0
In Progress
0
Critical
Activity ID Activity Name WBS Status Start Finish Dur (d) Rem (d) % Comp Float (d)
RPL10.INT.EF2.01525 RPL10.Interior.EF2 - EF2 West - Install Wall Mounted Ladder Racks on Full Height EF Walls West EF-2 Not Started 05/18/26 05/22/26 6.2 6.2
0%
218.8
RPL10.INT.NS1.02020 RPL10.Interior.NS1 - Control Fault Domain 1 SQ6.1 - Install LV Side Aisle Cable Tray LV Side Tie-ins Not Started 05/18/26 05/21/26 5.0 5.0
0%
135.0
RPL10.INT.NS2.01250 RPL10.Interior.NS2 - Control Fault Domain 6 SQ1.2 - Install Copper from GS.IDF to BMS and EPMS panels Remaining Tie-ins post Mech Side Aisle install Not Started 05/18/26 06/15/26 25.0 25.0
0%
27.5
RPL10.INT.NS2.01270 RPL10.Interior.NS2 - Control Fault Domain 5 SQ2.2 - Install Vesda / FA Remaining Tie-ins post Mech Side Aisle install Not Started 05/18/26 06/15/26 25.0 25.0
0%
31.2
RPL10.INT.NS2.01280 RPL10.Interior.NS2 - Control Fault Domain 5 SQ2.2 - Install FW Remaining Tie-ins post Mech Side Aisle install Not Started 05/18/26 06/15/26 25.0 25.0
0%
18.8
RPL10.INT.NS2.01780 RPL10.Interior.NS2 - Control Fault Domain 2 SQ5.2 - Install LV Side Aisle HAC Busway LV Side Tie-ins Not Started 05/18/26 05/21/26 5.0 5.0
0%
87.5
RPL10.INT.NS2.02200 RPL10.Interior.NS2 - Control Fault Domain 5 SQ2.2 - Install TW Remaining Tie-ins post Mech Side Aisle install Not Started 05/18/26 06/15/26 25.0 25.0
0%
18.8
RPL10.INT.NS2.02825 RPL10.Interior.NS2 - Control Fault Domain 5 SQ2.2 - Install Duct (MES Side) Remaining Tie-ins post Mech Side Aisle install Not Started 05/18/26 06/15/26 25.0 25.0
0%
18.8
RPL10.MCUP.LP1.2500 RPL10.MCUP.Loop 1 - Install Bollards Hardscape and Landscape Not Started 05/18/26 06/01/26 12.5 12.5
0%
452.5
RPL10.MCUP.LP2.1640 RPL10.MCUP.Loop 2 - Install Site Grading for Paving *Start 05/08 Hardscape and Landscape Not Started 05/18/26 06/08/26 18.8 18.8
0%
452.5
RPL10.SKN.SSB.01070 RPL10.SKIN.SSB - Install Security Glazing, Doors and Ext Devices Not Started 05/18/26 05/19/26 2.5 2.5
0%
173.8
RPL10.WP2.01040 RPL10.Conn SSB - Construction Cx Server Ready - At mCup WP2 (GS/CARRIER/SFZ - INF, CAB [ISP/OSP], NET) Not Started 05/18/26 05/18/26 0.0 0.0
0%
22.5
RPL10.WP2.GSIDF.1580 RPL10.Conn GSIDFN41 Install & Test Network (FIM) Network Not Started 05/18/26 05/20/26 3.8 3.8
0%
227.5
RPL10.WP2.GSIDF.1680 RPL10.Conn IDF Huts - (GSMDF to GSIDF) NS4 N43 WBS Summary GSIDFN43 Not Started 05/18/26 06/24/26 33.8 33.8
0%
456.2
RPL10.WP2.GSIDF.1700 RPL10.Conn GSIDFN43 Set Infrastructure (Racks, Waterfalls etc.) Infrastructure Not Started 05/18/26 05/22/26 6.2 6.2
0%
208.8
RPL10.WP2.GSIDF.1820 RPL10.Conn GSIDFN31 Install & Test Network (FIM) Network Not Started 05/18/26 05/20/26 3.8 3.8
0%
227.5
RPL10.WP2.GSIDF.1920 RPL10.Conn IDF Huts - (GSMDF to GSIDF) NS3 N33 WBS Summary GSIDFN33 Not Started 05/18/26 06/24/26 33.8 33.8
0%
456.2
RPL10.WP2.GSIDF.1940 RPL10.Conn GSIDFN33 Set Infrastructure (Racks, Waterfalls etc.) Infrastructure Not Started 05/18/26 05/22/26 6.2 6.2
0%
208.8
RPL10.WP2.GSIDF.2860 RPL10.Conn GSIDFNX11 Install & Test Network (FIM) Network Not Started 05/18/26 05/20/26 3.8 3.8
0%
227.5
RPL10.WP2.GSIDF.2940 RPL10.Conn GSIDFNX12 Install & Test Network (FIM) Network Not Started 05/18/26 05/20/26 3.8 3.8
0%
227.5
RPL10.WP2.GSIDF.3160 RPL10.Conn GSIDFN41 Install Copper, WAPs, Security Camera & Access Control Cabling Not Started 05/18/26 06/03/26 15.0 15.0
0%
300.0
RPL10.WP2.GSIDF.3220 RPL10.Conn GSIDFN31 Install Copper, WAPs, Security Camera & Access Control Cabling Not Started 05/18/26 06/03/26 15.0 15.0
0%
300.0
RPL10.WP2.GSIDF.3480 RPL10.Conn GSIDFNX11 Install Copper, WAPs, Security Camera & Access Control Cabling Not Started 05/18/26 05/20/26 3.8 3.8
0%
486.2
RPL10.WP2.GSIDF.3500 RPL10.Conn GSIDFNX12 Install Copper, WAPs, Security Camera & Access Control Cabling Not Started 05/18/26 06/01/26 12.5 12.5
0%
477.5
RPL10.WP4.027220 RPL10.Conn NS1.CFD6.48<>03-05 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] Prefab Not Started 05/18/26 05/20/26 3.8 3.8
0%
135.0
RPL10.WP4.027420 RPL10.Conn NS1.CFD5.48<>03-05 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] Prefab Not Started 05/18/26 05/19/26 2.5 2.5
0%
136.2
RPL10.WP4.027620 RPL10.Conn NS1.CFD4.48<>03-05 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] Prefab Not Started 05/18/26 05/19/26 2.5 2.5
0%
136.2
RPL10.WP4.028420 RPL10.Conn NS2.CFD6.48<>03-05 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] Prefab Not Started 05/18/26 05/19/26 2.5 2.5
0%
147.5
RPL10.WP4.028620 RPL10.Conn NS2.CFD5.48<>03-05 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] Prefab Not Started 05/18/26 05/19/26 2.5 2.5
0%
147.5
RPL10.WP4.NS1.01800 RPL10.Conn NS1.CFD6 Network - WBS Summary Network Not Started 05/18/26 11/06/26 152.5 152.5
0%
51.2
RPL10.WP4.NS1.02480 RPL10.Conn NS1.CFD5 Network - WBS Summary Network Not Started 05/18/26 11/10/26 155.0 155.0
0%
48.8
RPL10.WP4.NS1.02720 RPL10.Conn NS1.CFD4 Network - WBS Summary Network Not Started 05/18/26 11/13/26 157.5 157.5
0%
46.2
RPL10.WP4.NS2.01080 RPL10.Conn NS2.CFD6 Network - WBS Summary Network Not Started 05/18/26 11/19/26 162.5 162.5
0%
52.5
RPL10.WP4.NS2.02220 RPL10.Conn NS2.CFD5 Network - WBS Summary Network Not Started 05/18/26 11/06/26 152.5 152.5
0%
62.5
DCC.B10.3527 [NWB] Cabling Start : Front End Production Cabling [NWS 1] Connectivity Not Started 05/19/26 05/19/26 0.0 0.0
0%
883.8
DCC.B10.3529 [NWB] Cabling Start : Back End Production Cabling [NWS 1] Connectivity Not Started 05/19/26 05/19/26 0.0 0.0
0%
883.8
JCL.C.1380 RPL10 - Cost Risk LOE-19 Connectivity Package 3A - Front End Infra & Cabling (OSP,OH) Cost LOEs Not Started 05/19/26 08/26/26 87.5 87.5
0%
121.2
RPL10.EY.EF1.01240 RPL10.EY.EF1 - Install RPL-2 Total Road Closure For Fiber Supprt Platform Fiber Support Platform - RPL-2 Not Started 05/19/26 07/29/26 62.5 62.5
0%
223.8
RPL10.EY.EF1.01270 RPL10.EY.EF1 - Install RPL-1 FSP Floor Grating Fiber Support Platform - RPL-1 Not Started 05/19/26 06/02/26 12.5 12.5
0%
248.8
RPL10.EY.EF1.01280 RPL10.EY.EF1 - Install RPL-2 FSP Install Steel Span Structure Modules Fiber Support Platform - RPL-2 Not Started 05/19/26 06/02/26 12.5 12.5
0%
201.2
RPL10.EY.NS1.01330 RPL10.EY.NS1 - Install Early EY Paving Hardscape and Landscape Not Started 05/19/26 05/26/26 6.2 6.2
0%
181.2
RPL10.EY.NS3.01220 RPL10.EY.NS3 - Install MV, RMUs & Electrical Panels (15) OFE Not Started 05/19/26 06/16/26 25.0 25.0
0%
101.2
RPL10.EY.NS3.01230 RPL10.EY.NS3 - OFE - MV - WBS Summary OFE Not Started 05/19/26 07/08/26 43.8 43.8
0%
108.8
RPL10.INT.EF1.01430 RPL10.Interior.EF1 - EF1 East - Pull EPMS / BMS from panel to devices East EF-1 Not Started 05/19/26 05/26/26 6.2 6.2
0%
127.5
RPL10.INT.EF1.01440 RPL10.Interior.EF1 - EF1 East - Install copper from GS.IDF to BMS and EPMS panels East EF-1 Not Started 05/19/26 05/26/26 6.2 6.2
0%
127.5
RPL10.INT.EF1.01450 RPL10.Interior.EF1 - EF1 East - Fire Life Safety East EF-1 Not Started 05/19/26 05/28/26 8.8 8.8
0%
192.5
RPL10.INT.NS1.01480 RPL10.Interior.NS1 - Control Fault Domain 5 SQ2.1 - Install copper from GS.IDF to BMS and EPMS panels Remaining Tie-ins post Mech Side Aisle install Not Started 05/19/26 06/16/26 25.0 25.0
0%
42.5
RPL10.INT.NS2.01800 RPL10.Interior.NS2 - Control Fault Domain 2 SQ5.2 - Install LV Side Aisle Cable Tray LV Side Tie-ins Not Started 05/19/26 05/22/26 5.0 5.0
0%
131.2
RPL10.INT.NS4.01120 RPL10.Interior.NS4 - OFE - Control Fault Domain 1 SQ7.1 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary OFE NS4 Control Fault Domain 1 Not Started 05/19/26 08/24/26 85.0 85.0
0%
43.8
RPL10.INT.NS4.02480 RPL10.Interior.NS4 - OFE - Control Fault Domain 1 SQ7.1 (LV Side Aisle) OFE NS4 Control Fault Domain 1 Not Started 05/19/26 05/26/26 6.2 6.2
0%
110.0
RPL10.SSB.BB.1200 RPL10.Ext.Build Back.SSB - LO #5 - MEPF Trim Out Build Back Exterior Leave Out Wall #5 (East SSB) Not Started 05/19/26 06/02/26 12.5 12.5
0%
437.5
RPL10.WP2.CMDF1.1100 RPL10.Conn CMDF1 Includes Rack/ Stack/ Patch Network Not Started 05/19/26 05/21/26 3.8 3.8
0%
162.5
RPL10.WP2.GSIDF.2060 RPL10.Conn GSIDFNX01 Install Cabling (Pull, Splice & terminate) Cabling Not Started 05/19/26 05/26/26 6.2 6.2
0%
220.0
RPL10.WP2.GSIDF.2140 RPL10.Conn GSIDFNX02 Install Cabling (Pull, Splice & terminate) Cabling Not Started 05/19/26 05/26/26 6.2 6.2
0%
22.5
RPL10.WP3A.EF.01020 RPL10.Conn EF1F Infrasturcture 1 (Racks & Vertical Cable Manager, Ladder Racks) Infrastructure & Cabling Not Started 05/19/26 06/16/26 25.0 25.0
0%
113.8
RPL10.WP3A.EF.02000 RPL10.Conn EF1F OSP Pathway - WBS Summary Infrastructure & Cabling Not Started 05/19/26 06/30/26 37.5 37.5
0%
201.2
RPL.CM.D.N5635.XR US 80 Turn Lane at Bypass Rd Logistics - Off-Site Receive XREF Milsetones Not Started 05/20/26 05/20/26 0.0 0.0
0%
128.8
RPL10.CTRC.BB.3575 RPL10.Int.Build Back.Center-Corr - LO #7B - MEPF - In Wall Build Back Interior Leave Out Wall #7, #7B #9 (Center Corr) Not Started 05/20/26 05/22/26 3.8 3.8
0%
160.0
RPL10.EY.EF1.01360 RPL10.EY.EF1 - Install BMS Tie-ins Tie-ins Not Started 05/20/26 05/27/26 6.2 6.2
0%
126.2
RPL10.EY.EF2.01220 RPL10.EY.EF2 - Install RPL-3 Total Road Closure For Fiber Supprt Platform Fiber Support Platform - RPL-3 Not Started 05/20/26 07/30/26 62.5 62.5
0%
235.0
RPL10.EY.EF2.01650 RPL10.EY.EF2 - Remaining L2 Checklist Completion Tie-ins Not Started 05/20/26 05/27/26 6.2 6.2
0%
182.5
RPL10.EY.EF2.01850 RPL10.EY.EF2 - Install RPL-3 FSP Columns Cap Cure Fiber Support Platform - RPL-3 Not Started 05/20/26 06/09/26 17.5 17.5
0%
195.0
RPL10.EY.EF2.01910 RPL10.EY.EF2 - Install RPL-5 FSP Columns Cap Erect Shoring & Decking & F/R/P (DPR Side) Fiber Support Platform - RPL-5 Not Started 05/20/26 05/22/26 3.8 3.8
0%
215.0
RPL10.INT.CTRC.01360 RPL10.Interior.Center-Corridor - BoW - Install Flooring Tiles / Resinous Flooring in specific rooms Balance of Walls & OverHead Not Started 05/20/26 05/22/26 3.8 3.8
0%
187.5
RPL10.INT.CTRC.01370 RPL10.Interior.Center-Corridor - BoW - Install Duct Drop Trim Out Balance of Walls & OverHead Not Started 05/20/26 05/26/26 5.0 5.0
0%
127.5
RPL10.INT.ENDC.01480 RPL10.Interior.End-Corridor - BoW - Tape Finish Paint BoW Balance of Walls & Overhead Not Started 05/20/26 05/27/26 6.2 6.2
0%
183.8
RPL10.INT.NS2.01920 RPL10.Interior.NS2 - Control Fault Domain 1 SQ6.2 - Install LV Side Aisle HAC Busway LV Side Tie-ins Not Started 05/20/26 05/26/26 5.0 5.0
0%
95.0
RPL10.WP2.CMDF1.1020 RPL10.Conn CMDF1 Install & Test Network (FIM) Network Not Started 05/20/26 05/27/26 6.2 6.2
0%
195.0
RPL10.WP2.CMDF2.1060 RPL10.Conn CMDF2 Includes Rack/ Stack/ Patch Network Not Started 05/20/26 05/22/26 3.8 3.8
0%
161.2
RPL10.WP4.027440 RPL10.Conn NS1.CFD5.48<>06-10 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] Prefab Not Started 05/20/26 05/22/26 3.8 3.8
0%
136.2
RPL10.WP4.027640 RPL10.Conn NS1.CFD4.48<>06-10 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] Prefab Not Started 05/20/26 05/22/26 3.8 3.8
0%
136.2
RPL10.WP4.028440 RPL10.Conn NS2.CFD6.48<>06-10 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] Prefab Not Started 05/20/26 05/22/26 3.8 3.8
0%
147.5
RPL10.WP4.028640 RPL10.Conn NS2.CFD5.48<>06-10 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] Prefab Not Started 05/20/26 05/22/26 3.8 3.8
0%
147.5
RPL10.INT.CTRC.01480 RPL10.Interior.Center-Corridor - BoW - Electrical L2 Checklist Completion Balance of Walls & OverHead Not Started 05/21/26 06/04/26 12.5 12.5
0%
125.0
RPL10.INT.EF2.01240 RPL10.Interior.EF2 - North CRAH Gallery - Leak Detection / Heat Trace North CRAH Gallery Not Started 05/21/26 05/28/26 6.2 6.2
0%
136.2
RPL10.INT.NS2.01930 RPL10.Interior.NS2 - Control Fault Domain 1 SQ6.2 - Install LV Side Aisle Cable Tray LV Side Tie-ins Not Started 05/21/26 05/27/26 5.0 5.0
0%
118.8
RPL10.INT.NS4.01130 RPL10.Interior.NS4 - Control Fault Domain 1 SQ7.1 - Install Duct (LV Side) LV Side Tie-ins Not Started 05/21/26 05/28/26 6.2 6.2
0%
122.5
RPL10.INT.NS4.01160 RPL10.Interior.NS4 - Tie-ins - Control Fault Domain 1 SQ7.1 - WBS Summary Tie-Ins NS4 Control Fault Domain 1 Not Started 05/21/26 10/15/26 128.8 128.8
0%
55.0
RPL10.INT.SSBC.01440 RPL10.Interior.SSB-Corridor - BoW - Electrical L2 Checklist Completion Balance of Walls & OverHead Not Started 05/21/26 06/04/26 12.5 12.5
0%
123.8
RPL10.INT.SSBC.01470 RPL10.Interior.SSB-Corridor - BoW - Mechanical L2 Checklist Completion Balance of Walls & OverHead Not Started 05/21/26 06/04/26 12.5 12.5
0%
123.8
RPL10.MCUP.LP2.2040 RPL10.MCUP.Loop 2 - Tie-in - MV Loop L2 Checklist Completion Tie-Ins Electrical Not Started 05/21/26 06/04/26 12.5 12.5
0%
136.2
RPL10.MCUP.LP2.2080 RPL10.MCUP.Loop 2 - Tie-in - Mechanical L2 Checklist Completion Tie-Ins Mechanical Not Started 05/21/26 06/04/26 12.5 12.5
0%
137.5
RPL10.WP2.CMDF2.1040 RPL10.Conn CMDF2 Install & Test Network (FIM) Network Not Started 05/21/26 05/28/26 6.2 6.2
0%
193.8
RPL10.WP4.027240 RPL10.Conn NS1.CFD6.48<>06-10 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] Prefab Not Started 05/21/26 05/26/26 3.8 3.8
0%
135.0
RPL10.INT.EF2.01260 RPL10.Interior.EF2 - Tie-ins - South CRAH Gallery - WBS Summary South CRAH Gallery Not Started 05/22/26 06/26/26 31.2 31.2
0%
177.5
RPL10.INT.EF2.01410 RPL10.Interior.EF2 - EF2 East - Install Lower Trays East EF-2 Not Started 05/22/26 05/29/26 6.2 6.2
0%
37.5
RPL10.INT.EF2.01420 RPL10.Interior.EF2 - EF2 East - Install Lighting East EF-2 Not Started 05/22/26 06/09/26 15.0 15.0
0%
126.2
RPL10.INT.EF2.01750 RPL10.Interior.EF2 - South CRAH Gallery - Piping Tie-ins FW (In Gallery #3 CRAH Units) South CRAH Gallery Not Started 05/22/26 06/04/26 11.2 11.2
0%
130.0
RPL10.INT.NS1.01530 RPL10.Interior.NS1 - Control Fault Domain 4 SQ3.1 - Pull BMS from panel to devices Remaining Tie-ins post Mech Side Aisle install Not Started 05/22/26 06/19/26 25.0 25.0
0%
48.8
RPL10.INT.NS1.01540 RPL10.Interior.NS1 - Control Fault Domain 4 SQ3.1 - Pull EPMS from panel to devices Remaining Tie-ins post Mech Side Aisle install Not Started 05/22/26 06/19/26 25.0 25.0
0%
48.8
RPL10.INT.NS1.01550 RPL10.Interior.NS1 - Control Fault Domain 4 SQ3.1 - Set UPS and Panel (2) and GS.IDF N12 Remaining Tie-ins post Mech Side Aisle install Not Started 05/22/26 06/19/26 25.0 25.0
0%
42.5
RPL10.INT.NS2.01115 RPL10.Interior.NS2 - MES Skids - EPMS Tie-Ins ( 2 per day) NS2 - MES Skids Not Started 05/22/26 06/25/26 30.0 30.0
0%
157.5
RPL10.INT.NS3.01092 RPL10.Interior.NS3 - LV Skids and TopHat - Maintenance and Reserve Busways NS3 - LV Skids and TopHat Not Started 05/22/26 06/12/26 18.8 18.8
0%
171.2
RPL10.INT.NS4.01093 RPL10.Interior.NS4 - LV Skids and TopHat - Top Hat Busway NS4 - LV Skids and TopHat Not Started 05/22/26 06/12/26 18.8 18.8
0%
165.0
RPL10.MCUP.LP2.2060 RPL10.MCUP.Loop 2 - Tie-in - Electrical L2 Checklist Completion Tie-Ins Electrical Not Started 05/22/26 06/05/26 12.5 12.5
0%
136.2
DCC.B10.3200 [NWB] CorpNet/Security/FacNet Ready [GS-CORE] Connectivity Not Started 05/26/26 05/26/26 0.0 0.0
0%
161.2
GCD.RPL10.1116 RPL10 EY Ready for Energization Construction Milestones Not Started 05/26/26 05/26/26 0.0 0.0
0%
181.2
RPL.GF.D.N0115.XR 2 of 4 Fiber Test Complete (CAV1/4) MMH to GS.EF1/ Prod.EF1F Connectivity (XREFs) Not Started 05/26/26 05/26/26 0.0 0.0
0%
161.2
RPL.GF.D.N0140.XG NWB FacNet/CorpNet Live - to IBOS & Admin Building (Mortenson) Give Milestones (XREFs) Not Started 05/26/26 05/26/26 0.0 0.0
0%
878.8
RPL.GF.D.N0150.XG NWB FacNet/CorpNet Live - to AI Buildings (Turner) Give Milestones (XREFs) Not Started 05/26/26 05/26/26 0.0 0.0
0%
878.8