Schedule Viewer

Last schedule upload: D3-R25005-00-RPL10 — 8463 activities — 05/05/2026 09:13 AM CT
RPL10 - GC LIVE SCHEDULE - Data Date 20260426.xer · Uploaded May 05, 2026 02:13 PM · 8463 activities
Experimental Auto-populate checklist dates from schedule:
Clear
100
Activities Shown
0
Completed
0
In Progress
2
Critical
Activity ID Activity Name WBS Status Start Finish Dur (d) Rem (d) % Comp Float (d)
RPL10.INT.NS2.01380 RPL10.Interior.NS2 - Control Fault Domain 5 SQ2.2 - Install LV Side Aisle Cable Tray LV Side Tie-ins Not Started 05/11/26 05/14/26 5.0 5.0
0%
37.5
RPL10.INT.NS3.01065 RPL10.Interior.NS3 - OFE - Electrical Panels (ATS,SB House,MCB,MLO, Transformer) - Set / Anchor OFE Not Started 05/11/26 05/15/26 6.2 6.2
0%
160.0
RPL10.INT.NS3.01100 RPL10.Interior.NS3 - Tie-ins - WBS Summary Tie-Ins Not Started 05/11/26 01/19/27 216.2 216.2
0%
126.2
RPL10.INT.NS3.01110 RPL10.Interior.NS3 - MES Skids Tie-ins (LOE) NS3 - MES Skids Not Started 05/11/26 08/04/26 75.0 75.0
0%
240.0
RPL10.INT.NS3.01111 RPL10.Interior.NS3 - MES Skids - Set & Anchor Interconnects NS3 - MES Skids Not Started 05/11/26 06/12/26 30.0 30.0
0%
123.8
RPL10.INT.SSB.01390 RPL10.Interior.SSB - BoW - Plumbing Trim Out Balance of Walls and OverHead Not Started 05/11/26 05/15/26 6.2 6.2
0%
211.2
RPL10.INT.SSB.01400 RPL10.Interior.SSB - BoW - Fire Life Safety Trim Out / Fire Alarm Trim Out Balance of Walls and OverHead Not Started 05/11/26 05/19/26 8.8 8.8
0%
211.2
RPL10.INT.SSB.01470 RPL10.Interior.SSB - Loading Dock and Storage - Install Unit Heaters Loading Dock and Storage Not Started 05/11/26 05/15/26 6.2 6.2
0%
200.0
RPL10.INT.SSB.01530 RPL10.Interior.SSB - Loading Dock and Storage - Install OverHead Doors (Mob 1) Loading Dock and Storage Not Started 05/11/26 05/12/26 2.5 2.5
0%
185.0
RPL10.INT.SSB.01780 RPL10.Interior.SSB - Loading Dock and Storage - Install Split Systems/Humidifiers Loading Dock and Storage Not Started 05/11/26 05/15/26 6.2 6.2
0%
181.2
RPL10.MCUP.LP1.2020 RPL10.MCUP.Loop 1 - Tie-in - MV Loop L2 Checklist Completion Tie-Ins Electrical Not Started 05/11/26 05/21/26 11.2 11.2
0%
16.2
RPL10.WP2.01030 RPL10.Conn SSB - Early Construction Cx Server Ready - At NS1 (LV) WP2 (GS/CARRIER/SFZ - INF, CAB [ISP/OSP], NET) Not Started 05/11/26 05/11/26 0.0 0.0
0%
62.5
RPL10.WP2.GSIDF.1500 RPL10.Conn GSIDFN23 Install & Test Network (FIM) Network Not Started 05/11/26 05/13/26 3.8 3.8
0%
233.8
RPL10.WP2.GSIDF.3100 RPL10.Conn GSIDFN13 Install Copper, WAPs, Security Camera & Access Control Cabling Not Started 05/11/26 05/27/26 15.0 15.0
0%
191.2
RPL10.WP2.GSIDF.3140 RPL10.Conn GSIDFN23 Install Copper, WAPs, Security Camera & Access Control Cabling Not Started 05/11/26 05/27/26 15.0 15.0
0%
191.2
RPL.GF.D.N0250.XR Fiber Pulls, Test & Term All Prod EF to EF Complete RPL 10 to RPL6 Connectivity (XREFs) Not Started 05/12/26 05/12/26 0.0 0.0
0%
232.5
RPL10.CFCI.5260 RPL10 - Fabricate / Deliver - Specialities (CFCI) Div. 10 - Specialities Not Started 05/12/26 05/26/26 12.5 12.5
0%
147.5
RPL10.EY.NS1.01290 RPL10.EY.NS1 - Install Sleeves MEPL Hardscape and Landscape Not Started 05/12/26 05/18/26 6.2 6.2
0%
181.2
RPL10.EY.NS1.01300 RPL10.EY.NS1 - MV Loop 1 - L2 Checklist Completion Tie-ins Not Started 05/12/26 05/26/26 12.5 12.5
0%
22.5
RPL10.EY.NS1.01310 RPL10.EY.NS1 - MV Loop 2 - L2 Checklist Completion Tie-ins Not Started 05/12/26 05/26/26 12.5 12.5
0%
65.0
RPL10.EY.NS1.01320 RPL10.EY.NS1 - Install Hardscape and Landscape - WBS Summary Hardscape and Landscape Not Started 05/12/26 10/15/26 137.5 137.5
0%
357.5
RPL10.EY.NS4.01220 RPL10.EY.NS4 - Install MV, RMUs & Electrical Panels (15) OFE Not Started 05/12/26 06/09/26 25.0 25.0
0%
107.5
RPL10.EY.NS4.01230 RPL10.EY.NS4 - OFE - MV - WBS Summary OFE Not Started 05/12/26 06/30/26 43.8 43.8
0%
101.2
RPL10.INT.CTRC.01460 RPL10.Interior.Center-Corridor - BoW - Install Lighting Balance of Walls & OverHead Not Started 05/12/26 05/20/26 8.8 8.8
0%
125.0
RPL10.INT.EF1.01410 RPL10.Interior.EF1 - EF1 East - Install Lower Trays East EF-1 Not Started 05/12/26 05/18/26 6.2 6.2
0%
47.5
RPL10.INT.EF1.01420 RPL10.Interior.EF1 - EF1 East - Install Lighting East EF-1 Not Started 05/12/26 05/28/26 15.0 15.0
0%
125.0
RPL10.INT.NS1.01450 RPL10.Interior.NS1 - Control Fault Domain 5 SQ2.1 - Install Mechanical Side Aisle Cable Tray Remaining Tie-ins post Mech Side Aisle install Not Started 05/12/26 06/09/26 25.0 25.0
0%
32.5
RPL10.INT.NS1.01750 RPL10.Interior.NS1 - Control Fault Domain 3 SQ4.1 - Install LV Side Aisle Cable Tray LV Side Tie-ins Not Started 05/12/26 05/15/26 5.0 5.0
0%
110.0
RPL10.INT.NS2.01114 RPL10.Interior.NS2 - MES Skids - BMS Tie-Ins ( 2 per day) NS2 - MES Skids Not Started 05/12/26 06/15/26 30.0 30.0
0%
157.5
RPL10.INT.NS2.01510 RPL10.Interior.NS2 - Control Fault Domain 4 SQ3.2 - Install LV Side Aisle HAC Busway LV Side Tie-ins Not Started 05/12/26 05/15/26 5.0 5.0
0%
72.5
RPL10.INT.NS2.02525 RPL10.Interior.NS2 - OFE - Control Fault Domain 5 SQ2.2 (HAC) OFE NS2 Control Fault Domain 5 Not Started 05/12/26 06/02/26 18.8 18.8
0%
-18.8
RPL10.INT.NS3.01060 RPL10.Interior.NS3 - OFE - LV Skids and TopHat - Set / Place / Anchor (04.30.26) (Rev-05.11.26) OFE Not Started 05/12/26 06/09/26 25.0 25.0
0%
80.0
RPL10.INT.NS4.01112 RPL10.Interior.NS4 - MES Skids - Piping Tie-Ins & Inspections NS4 - MES Skids Not Started 05/12/26 06/15/26 30.0 30.0
0%
135.0
RPL10.MCUP.LP1.2060 RPL10.MCUP.Loop 1 - Tie-in - Electrical L2 Checklist Completion Tie-Ins Electrical Not Started 05/12/26 05/22/26 11.2 11.2
0%
16.2
RPL10.SSB.BB.1130 RPL10.Ext.Build Back.SSB - LO #5 - Hang, Tape and Finish Build Back Exterior Leave Out Wall #5 (East SSB) Not Started 05/12/26 05/18/26 6.2 6.2
0%
437.5
RPL10.WP2.GSIDF.1200 RPL10.Conn GSIDFNE1 Install & Test Network (FIM) Network Not Started 05/12/26 05/14/26 3.8 3.8
0%
148.8
RPL10.WP2.GSIDF.2020 RPL10.Conn IDF Huts - (GSMDF to GSIDF) NS1 NX01 WBS Summary GSIDFNX01 Not Started 05/12/26 05/29/26 16.2 16.2
0%
478.8
RPL10.WP2.GSIDF.2040 RPL10.Conn GSIDFNX01 Set Infrastructure (Racks, Waterfalls etc.) Infrastructure Not Started 05/12/26 05/18/26 6.2 6.2
0%
220.0
RPL10.WP2.GSIDF.2100 RPL10.Conn IDF Huts - (GSMDF to GSIDF) NS1 NX02 WBS Summary GSIDFNX02 Not Started 05/12/26 05/29/26 16.2 16.2
0%
478.8
RPL10.WP2.GSIDF.2120 RPL10.Conn GSIDFNX02 Set Infrastructure (Racks, Waterfalls etc.) Infrastructure Not Started 05/12/26 05/18/26 6.2 6.2
0%
22.5
RPL10.WP2.GSIDF.3060 RPL10.Conn GSIDFNE1 Install Copper, WAPs, Security Camera & Access Control Cabling Not Started 05/12/26 06/02/26 18.8 18.8
0%
476.2
RPL.10.D.X33X7.XR Cable Pull to Concrete Pad - RPL10 NS4 Loop 1 & 2 Power (XREFs) Not Started 05/13/26 05/13/26 0.0 0.0
0%
33.8
RPL.10.D.X4420.XR Natural Gas Available for Fill/Flush Cx - Utility connections (L3/L4) Water / Gas Available (XREFs) Not Started 05/13/26 05/13/26 0.0 0.0
0%
51.2
RPL.GF.D.G4620.XG Rack & Cabinets Complete - DHB - RPL6 Give Milestones (XREFs) Not Started 05/13/26 05/13/26 0.0 0.0
0%
227.0
RPL10.INT.ENDC.01100 RPL10.Interior.End-Corridor - BoW - Install Controls / EPMS / BMS OH and In-wall Balance of Walls & Overhead Not Started 05/13/26 05/18/26 5.0 5.0
0%
247.5
RPL10.INT.ENDC.1560 RPL10.Interior.End-Corridor - BoW - Hang Drywall BoW Balance of Walls & Overhead Not Started 05/13/26 05/22/26 10.0 10.0
0%
183.8
RPL10.INT.NS1.01430 RPL10.Interior.NS1 - Control Fault Domain 6 SQ1.1 - L2 Checklist Completion Remaining Tie-ins post Mech Side Aisle install Not Started 05/13/26 06/10/26 25.0 25.0
0%
37.5
RPL10.INT.NS1.01870 RPL10.Interior.NS1 - Control Fault Domain 2 SQ5.1 - Install LV Side Aisle HAC Busway LV Side Tie-ins Not Started 05/13/26 05/18/26 5.0 5.0
0%
97.5
RPL10.INT.NS2.01520 RPL10.Interior.NS2 - Control Fault Domain 4 SQ3.2 - Install LV Side Aisle Cable Tray LV Side Tie-ins Not Started 05/13/26 05/18/26 5.0 5.0
0%
95.0
RPL10.INT.NS2.01820 RPL10.Interior.NS2 - Control Fault Domain 1 SQ6.2 - Install Duct (LV Side) LV Side Tie-ins Not Started 05/13/26 05/18/26 5.0 5.0
0%
68.8
RPL10.INT.NS2.01850 RPL10.Interior.NS2 - Tie-ins - Control Fault Domain 1 SQ6.2 - WBS Summary Tie-Ins NS2 Control Fault Domain 1 Not Started 05/13/26 09/30/26 122.5 122.5
0%
8.8
RPL10.INT.NS3.01094 RPL10.Interior.NS3 - Electrical Panels/Ancillary Skid (ATS,SB House,MCB,MLO, Transformer) - Tie-Ins NS3 - LV Skids and TopHat Not Started 05/13/26 06/03/26 18.8 18.8
0%
160.0
RPL.GF.D.N0125.XR 4 of 4 Fiber Test Complete CAV2/3 to GS.EF2/ Prod.EF2B Connectivity (XREFs) Not Started 05/14/26 05/14/26 0.0 0.0
0%
161.2
RPL10.INT.CTRC.01290 RPL10.Interior.Center-Corridor - BoW - Remaining Mechanical OFE Tie In Balance of Walls & OverHead Not Started 05/14/26 05/18/26 3.8 3.8
0%
127.5
RPL10.INT.NS1.01890 RPL10.Interior.NS1 - Control Fault Domain 2 SQ5.1 - Install LV Side Aisle Cable Tray LV Side Tie-ins Not Started 05/14/26 05/19/26 5.0 5.0
0%
131.2
RPL10.INT.NS1.02560 RPL10.Interior.NS1 - OFE - Control Fault Domain 4 SQ3.1 (Mech Side Aisle) OFE NS1 Control Fault Domain 4 Not Started 05/14/26 06/02/26 16.2 16.2
0%
2.5
RPL10.INT.NS2.01650 RPL10.Interior.NS2 - Control Fault Domain 3 SQ4.2 - Install LV Side Aisle HAC Busway LV Side Tie-ins Not Started 05/14/26 05/19/26 5.0 5.0
0%
80.0
RPL10.INT.NS3.01090 RPL10.Interior.NS3 - LV Skids and TopHat Tie-ins (LOE) NS3 - LV Skids and TopHat Not Started 05/14/26 06/19/26 32.5 32.5
0%
171.2
RPL10.INT.NS3.01091 RPL10.Interior.NS3 - LV Skids and TopHat - Set & Anchor Interconnects NS3 - LV Skids and TopHat Not Started 05/14/26 06/09/26 22.5 22.5
0%
171.2
RPL10.INT.SSB.01250 RPL10.Interior.SSB - Loading Dock and Storage - Install Security Loading Dock and Storage Not Started 05/14/26 05/22/26 8.8 8.8
0%
175.0
RPL10.INT.SSB.01270 RPL10.Interior.SSB - Loading Dock and Storage - Install Controls / EPMS / BMS *Separate EPMS *Whats Scope Check Trade Loading Dock and Storage Not Started 05/14/26 05/19/26 5.0 5.0
0%
175.0
RPL10.INT.SSB.01300 RPL10.Interior.SSB - Loading Dock and Storage - Install Fire Life Safety / Fire Alarm Loading Dock and Storage Not Started 05/14/26 05/22/26 8.8 8.8
0%
175.0
RPL10.INT.SSB.07100 RPL10.Interior.SSB - Loading Dock and Storage - Install OverHead Doors (Mob 2) Loading Dock and Storage Not Started 05/14/26 05/26/26 10.0 10.0
0%
173.8
RPL10.INT.SSBC.01400 RPL10.Interior.SSB-Corridor - BoW - Install Grounding Balance of Walls & OverHead Not Started 05/14/26 05/20/26 6.2 6.2
0%
123.8
RPL10.INT.SSBC.01410 RPL10.Interior.SSB-Corridor - BoW - Battery Connection Balance of Walls & OverHead Not Started 05/14/26 05/20/26 6.2 6.2
0%
123.8
RPL10.OFCI.6880 OFCI - Delivery ROJ: FE Fiber for CFD NS1.3 (ROJ ) (RVCD ) NS1 Not Started 05/14/26 06/04/26 18.8 18.8
0%
93.8
RPL10.WP2.CMDF1.1010 RPL10.Conn CMDF1 Install Cabling (Pull, Splice & terminate) Cabling Not Started 05/14/26 05/19/26 5.0 5.0
0%
162.5
RPL10.WP2.CMDF2.1020 RPL10.Conn CMDF2 Install Cabling (Pull, Splice & terminate) Cabling Not Started 05/14/26 05/20/26 6.2 6.2
0%
161.2
RPL10.WP2.GSIDF.1210 CorpNet & FacNet Available - EF Network Not Started 05/14/26 05/14/26 0.0 0.0
0%
232.5
RPL10.WP2.MDF1.1240 RPL10.Conn C.MDF1 <> GS.MDF1 - Pull, Splice, Terminate & Test Cabling Not Started 05/14/26 05/19/26 5.0 5.0
0%
165.0
RPL10.WP2.MDF2.1240 RPL10.Conn C.MDF2 <> GS.MDF2 - Pull, Splice, Terminate & Test Cabling Not Started 05/14/26 05/19/26 5.0 5.0
0%
165.0
RPL10.CTRC.BB.1840 RPL10.Int.Build Back.Center-Corr - LO #7,7B - Arch Finishes - Frame and Hang Drywall, Paint, Final Finishes (LOE) Build Back Interior Leave Out Wall #7, #7B #9 (Center Corr) Not Started 05/15/26 06/25/26 36.2 36.2
0%
141.2
RPL10.CTRC.BB.1940 RPL10.Int.Build Back.Center-Corr - Interior Leave Out (Center Corridor) #7,#7B, #9 WBS Summary Build Back Interior Leave Out Wall #7, #7B #9 (Center Corr) Not Started 05/15/26 07/24/26 61.2 61.2
0%
141.2
RPL10.CTRC.BB.3555 RPL10.Int.Build Back.Center-Corr - LO #7B - Frame Build Back Interior Leave Out Wall #7, #7B #9 (Center Corr) Not Started 05/15/26 05/19/26 3.8 3.8
0%
160.0
RPL10.EY.EF2.01890 RPL10.EY.EF2 - Install RPL-3 FSP Columns Cap Erect Shoring & Decking & F/R/P (DPR Side) Fiber Support Platform - RPL-3 Not Started 05/15/26 05/19/26 3.8 3.8
0%
195.0
RPL10.INT.CTRC.01350 RPL10.Interior.Center-Corridor - BoW - Final Paint Balance of Walls & OverHead Not Started 05/15/26 05/19/26 3.8 3.8
0%
127.5
RPL10.INT.EF2.01170 RPL10.Interior.EF2 - CFCI - Set South CRAH Units OFE Not Started 05/15/26 05/21/26 6.2 6.2
0%
130.0
RPL10.INT.EF2.01200 RPL10.Interior.EF2 - Tie-ins - North CRAH Gallery - WBS Summary North CRAH Gallery Not Started 05/15/26 06/26/26 37.5 37.5
0%
177.5
RPL10.INT.EF2.01370 RPL10.Interior.EF2 - EF2 East - Install Upper Trays East EF-2 Not Started 05/15/26 05/21/26 6.2 6.2
0%
37.5
RPL10.INT.EF2.01390 RPL10.Interior.EF2 - CFCI - Install CFCI Prefab Cable Rack - EF2 West OFE Not Started 05/15/26 06/05/26 18.8 18.8
0%
18.8
RPL10.INT.EF2.01730 RPL10.Interior.EF2 - North CRAH Gallery - Piping Tie-ins FW (In Gallery #3 CRAH Units) North CRAH Gallery Not Started 05/15/26 05/28/26 11.2 11.2
0%
136.2
RPL10.INT.NS1.01500 RPL10.Interior.NS1 - Control Fault Domain 4 SQ3.1 - Install Vesda / FA Remaining Tie-ins post Mech Side Aisle install Not Started 05/15/26 06/12/26 25.0 25.0
0%
48.8
RPL10.INT.NS1.01510 RPL10.Interior.NS1 - Control Fault Domain 4 SQ3.1 - Install FW Remaining Tie-ins post Mech Side Aisle install Not Started 05/15/26 06/12/26 25.0 25.0
0%
42.5
RPL10.INT.NS1.02010 RPL10.Interior.NS1 - Control Fault Domain 1 SQ6.1 - Install LV Side Aisle HAC Busway LV Side Tie-ins Not Started 05/15/26 05/20/26 5.0 5.0
0%
105.0
RPL10.INT.NS1.02240 RPL10.Interior.NS1 - Control Fault Domain 4 SQ3.1 - Install TW Remaining Tie-ins post Mech Side Aisle install Not Started 05/15/26 06/12/26 25.0 25.0
0%
42.5
RPL10.INT.NS1.02760 RPL10.Interior.NS1 - Control Fault Domain 4 SQ3.1 - Install Duct (MES Side) Remaining Tie-ins post Mech Side Aisle install Not Started 05/15/26 06/12/26 25.0 25.0
0%
42.5
RPL10.INT.NS2.01660 RPL10.Interior.NS2 - Control Fault Domain 3 SQ4.2 - Install LV Side Aisle Cable Tray LV Side Tie-ins Not Started 05/15/26 05/20/26 5.0 5.0
0%
118.8
RPL10.INT.NS2.02545 RPL10.Interior.NS2 - OFE - Control Fault Domain 5 SQ2.2 (Mech Side Aisle) OFE NS2 Control Fault Domain 5 Not Started 05/15/26 06/03/26 16.2 16.2
0%
-8.8
RPL10.INT.NS4.01092 RPL10.Interior.NS4 - LV Skids and TopHat - Maintenance and Reserve Busways NS4 - LV Skids and TopHat Not Started 05/15/26 06/05/26 18.8 18.8
0%
165.0
RPL10.MCUP.LP1.2080 RPL10.MCUP.Loop 1 - Tie-in - Mechanical L2 Checklist Completion Tie-Ins Mechanical Not Started 05/15/26 05/28/26 11.2 11.2
0%
12.5
RPL10.OFCI.6980 OFCI - Delivery ROJ: FE Fiber for CFD NS2.4 (ROJ ) (RVCD ) NS2 Not Started 05/15/26 06/05/26 18.8 18.8
0%
78.8
RPL10.SSBC.BB.1000 RPL10.Int.Build Back.SSB-Corr - LO #2,3,4 - MEPF Trim Out Build Back Interior Leave Out Wall #2 #3 #4 (SSB Corr) Not Started 05/15/26 05/29/26 12.5 12.5
0%
178.8
RPL10.SSBC.BB.1480 RPL10.Int.Build Back.SSB-Corr - LO #2,3,4 - MEPF - OH, Lowside, Lights Build Back Interior Leave Out Wall #2 #3 #4 (SSB Corr) Not Started 05/15/26 05/29/26 12.5 12.5
0%
178.8
JCL.C.1280 RPL10 - Cost Risk LOE-15 Security Systems Cost LOEs Not Started 05/18/26 01/05/27 198.8 198.8
0%
85.0
RPL10.EY.EF1.01290 RPL10.EY.EF1 - Install RPL-2 FSP Road Closure For Steel Erection Fiber Support Platform - RPL-2 Not Started 05/18/26 06/01/26 12.5 12.5
0%
202.5
RPL10.EY.EF1.01340 RPL10.EY.EF1 - Install RPL-1 FSP Final Roof (Standing Seam Panels) Phase 1 Fiber Support Platform - RPL-1 Not Started 05/18/26 05/26/26 7.5 7.5
0%
242.5
RPL10.EY.NS2.01290 RPL10.EY.NS2 - MV Loop 1 - L2 Checklist Completion Tie-ins Not Started 05/18/26 06/01/26 12.5 12.5
0%
27.5
RPL10.EY.SSB.01240 RPL10.EY.SSB - Install BMS Tie-ins Tie-ins Not Started 05/18/26 06/08/26 18.8 18.8
0%
120.0
RPL10.EY.SSB.01260 RPL10.EY.SSB - L2 Checklist Completion Tie-ins Not Started 05/18/26 06/01/26 12.5 12.5
0%
17.5
RPL10.INT.EF2.01490 RPL10.Interior.EF2 - Tie-ins - EF2 West - WBS Summary West EF-2 Not Started 05/18/26 08/19/26 82.5 82.5
0%
148.8