Schedule Viewer
Last schedule upload: D3-R25005-00-RPL10 — 8463 activities — 05/05/2026 09:13 AM CT
RPL10 - GC LIVE SCHEDULE - Data Date 20260426.xer
· Uploaded May 05, 2026 02:13 PM
· 8463 activities
Experimental
Auto-populate checklist dates from schedule:
100
Activities Shown
40
Completed
60
In Progress
45
Critical
| Activity ID | Activity Name | WBS | Status | Start | Finish | Dur (d) | Rem (d) | % Comp | Float (d) |
|---|---|---|---|---|---|---|---|---|---|
RPL10.INT.ENDC.1300 |
RPL10.Interior.End-Corridor - BoW - Install Plumbing Lowside OH and In-wall | Balance of Walls & Overhead | Active | 04/15/26 | 04/27/26 | 10.0 | 1.2 |
|
191.2 |
RPL10.INT.NS2.01350 |
RPL10.Interior.NS2 - OFE - Control Fault Domain 4 SQ3.2 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary | OFE NS2 Control Fault Domain 4 | Active | 04/15/26 | 06/24/26 | 62.5 | 20.0 |
|
-11.2 |
RPL10.INT.NS2.02565 |
RPL10.Interior.NS2 - OFE - Control Fault Domain 4 SQ3.2 (LV Side Aisle) - Row 10 | OFE NS2 Control Fault Domain 4 | Complete | 04/15/26 | 04/15/26 | 1.2 | 0.0 |
|
0.0 |
RPL10.INT.NS2.03285 |
RPL10.Interior.NS2 - OFE - Control Fault Domain 4 SQ3.2 (LV Side Aisle) - Remaining (11-13) | OFE NS2 Control Fault Domain 4 | Complete | 04/15/26 | 04/20/26 | 3.8 | 0.0 |
|
0.0 |
RPL10.INT.SSB.01130 |
RPL10.Interior.SSB - BoW - Paint (1st Coat) | Balance of Walls and OverHead | Complete | 04/15/26 | 04/17/26 | 3.8 | 0.0 |
|
0.0 |
RPL10.SSBC.BB.3195 |
RPL10.Int.Build Back.SSB-Corr - LO #2,3 - Hang Drywall | Build Back Interior Leave Out Wall #2 #3 #4 (SSB Corr) | Complete | 04/15/26 | 04/20/26 | 25.0 | 0.0 |
|
0.0 |
RPL10.INT.ENDC.06820 |
RPL10.Interior.End-Corridor - BoW - Install Remaining Unistruts & Hangers | Balance of Walls & Overhead | Complete | 04/16/26 | 04/22/26 | 6.2 | 0.0 |
|
0.0 |
RPL10.INT.NS2.01112 |
RPL10.Interior.NS2 - MES Skids - Final Piping Tie-Ins & Inspections | NS2 - MES Skids | Active | 04/16/26 | 05/19/26 | 30.0 | 21.2 |
|
47.5 |
RPL10.INT.NS2.02465 |
RPL10.Interior.NS2 - OFE - Control Fault Domain 6 SQ1.2 - (HAC) | OFE NS2 Control Fault Domain 6 | Active | 04/16/26 | 05/11/26 | 25.0 | 13.8 |
|
-18.8 |
RPL10.INT.SSB.01290 |
RPL10.Interior.SSB - BoW - Frame Hard Lid | Balance of Walls and OverHead | Complete | 04/16/26 | 04/22/26 | 6.2 | 0.0 |
|
0.0 |
RPL10.MCUP.LP1.1940 |
RPL10.MCUP.Loop 1 - Tie-in BMS #7 | Tie-Ins BMS | Active | 04/16/26 | 05/20/26 | 10.0 | 22.5 |
|
12.5 |
RPL.CM.D.N5665.XR |
Smalling Widening (LA 183 to Jaggers) | Logistics - Off-Site Receive XREF Milsetones | Complete | 04/17/26 | 04/17/26 | 0.0 | 0.0 |
|
0.0 |
RPL.CM.D.N5670.XR |
Smalling Repave (LA 183 to Jaggers) | Logistics - Off-Site Receive XREF Milsetones | Complete | 04/17/26 | 04/17/26 | 0.0 | 0.0 |
|
0.0 |
RPL10.EY.EF1.01150 |
RPL10.EY.EF1 - Install RPL-2 FSP Columns F/R/P | Fiber Support Platform - RPL-2 | Complete | 04/17/26 | 04/22/26 | 7.5 | 0.0 |
|
0.0 |
RPL10.EY.ENDC.01270 |
RPL10.Interior.End-Corridor - Install Temp Conditioning Return Duct (Inside) | Priority Walls & OverHead | Complete | 04/17/26 | 04/24/26 | 11.2 | 0.0 |
|
0.0 |
RPL10.INT.CTRC.01210 |
RPL10.Interior.Center-Corridor - BoW - Install Electrical Lowside OH and In-wall | Balance of Walls & OverHead | Active | 04/17/26 | 04/27/26 | 6.2 | 1.2 |
|
60.0 |
RPL10.INT.CTRC.01930 |
RPL10.Interior.Center-Corridor - BoW - QC BoW - Backing/In-Wall | Balance of Walls & OverHead | Complete | 04/17/26 | 04/24/26 | 6.2 | 0.0 |
|
0.0 |
RPL10.INT.SSB.07060 |
RPL10.Interior.SSB - Kitchen - Hang Drywall, Tape, Float, Paint (Remaining) | Kitchen and Office Spaces | Active | 04/17/26 | 04/28/26 | 6.2 | 2.5 |
|
188.8 |
RPL10.INT.SSBC.02280 |
RPL10.Interior.SSB-Corridor - BoW - Install Electrical Carrier MDF (10.N2.09) | Balance of Walls & OverHead | Active | 04/17/26 | 04/27/26 | 8.8 | 1.2 |
|
96.2 |
RPL10.INT.SSBC.02600 |
RPL10.Interior.SSB-Corridor - BoW - Install Fire Safing/ Seal all Penetrations (Lowside space) | Balance of Walls & OverHead | Complete | 04/17/26 | 04/23/26 | 6.2 | 0.0 |
|
0.0 |
RPL10.MCUP.LP1.2040 |
RPL10.MCUP.Loop 1 - Install Mcup Paving *Start 04/10 | Hardscape and Landscape | Active | 04/17/26 | 05/22/26 | 18.8 | 25.0 |
|
471.2 |
RPL10.MCUP.LP2.1560 |
RPL10.MCUP.Loop 2 - Tie-in Electrical (LOE) | Tie-Ins Electrical | Active | 04/17/26 | 05/26/26 | 26.2 | 26.2 |
|
136.2 |
RPL10.MCUP.LP2.1620 |
RPL10.MCUP.Loop 2 - Tie-in Electrical #2 | Tie-Ins Electrical | Active | 04/17/26 | 05/21/26 | 11.2 | 23.8 |
|
138.8 |
RPL10.MCUP.LP2.1740 |
RPL10.MCUP.Loop 2 - Tie-in Electrical #4 | Tie-Ins Electrical | Active | 04/17/26 | 05/26/26 | 8.8 | 23.8 |
|
136.2 |
RPL10.SSB.BB.1000 |
RPL10.Ext.Build Back.SSB - Exterior Leave Out #5 ( East SSB Area) WBS Summary | Build Back Exterior Leave Out Wall #5 (East SSB) | Active | 04/17/26 | 06/10/26 | 47.5 | 40.0 |
|
437.5 |
RPL10.SSB.BB.1140 |
RPL10.Ext.Build Back.SSB - LO #5 - F/R/P Stem wall | Build Back Exterior Leave Out Wall #5 (East SSB) | Complete | 04/17/26 | 04/20/26 | 3.8 | 0.0 |
|
0.0 |
JCL.C.1360 |
RPL10 - Cost Risk LOE-19 Connectivity Package 2 - GS Carrier SFZ | Cost LOEs | Active | 04/20/26 | 01/15/27 | 233.8 | 227.5 |
|
105.0 |
RPL.CM.D.C5500.XR |
Galaxy Road | Logistics - Onsite Receive XREF Milestones | Complete | 04/20/26 | 04/20/26 | 0.0 | 0.0 |
|
0.0 |
RPL.CM.D.N5605.XR |
LA 183 /Burn Road - Traffic Signal | Logistics - Off-Site Receive XREF Milsetones | Complete | 04/20/26 | 04/20/26 | 0.0 | 0.0 |
|
0.0 |
RPL10.EY.NS4.01140 |
RPL10.EY.NS4 - Install Tent Electrical Panels | Tent and Temp Conditions | Complete | 04/20/26 | 04/24/26 | 6.2 | 0.0 |
|
0.0 |
RPL10.EY.NS4.01150 |
RPL10.EY.NS4 - Install Tent Heating and Cooling Equipment | Tent and Temp Conditions | Complete | 04/20/26 | 04/24/26 | 6.2 | 0.0 |
|
0.0 |
RPL10.EY.NS4.01190 |
RPL10.EY.NS4 - Install Tent Mechanical Tie-ins | Tent and Temp Conditions | Complete | 04/20/26 | 04/24/26 | 7.5 | 0.0 |
|
0.0 |
RPL10.INT.CTRC.01230 |
RPL10.Interior.Center-Corridor - BoW - Install Security Lowside OH and In-wall | Balance of Walls & OverHead | Active | 04/20/26 | 04/28/26 | 8.8 | 2.5 |
|
145.0 |
RPL10.INT.EF1.01210 |
RPL10.Interior.EF1 - Tie-ins - WBS Summary | Tie-Ins | Active | 04/20/26 | 07/24/26 | 85.0 | 78.8 |
|
158.8 |
RPL10.INT.EF1.01750 |
RPL10.Interior.EF1 - Piping Tie-Ins to FW Loop (From MES Skids) | Tie-Ins | Complete | 04/20/26 | 04/24/26 | 6.2 | 0.0 |
|
0.0 |
RPL10.INT.EF2.01210 |
RPL10.Interior.EF2 - Tie-ins - WBS Summary | Tie-Ins | Active | 04/20/26 | 08/19/26 | 107.5 | 88.8 |
|
148.8 |
RPL10.INT.EF2.01810 |
RPL10.Interior.EF2 - Piping Tie-Ins to FW Loop (From MES Skids) | Tie-Ins | Complete | 04/20/26 | 04/24/26 | 6.2 | 0.0 |
|
0.0 |
RPL10.INT.NS1.01225 |
RPL10.Interior.NS1 - Control Fault Domain 6 SQ1.1 - Install Duct (MES Side) | Remaining Tie-ins post Mech Side Aisle install | Complete | 04/20/26 | 04/21/26 | 25.0 | 0.0 |
|
0.0 |
RPL10.INT.NS1.01770 |
RPL10.Interior.NS1 - Control Fault Domain 2 SQ5.1 - Install Duct (LV Side) | LV Side Tie-ins | Complete | 04/20/26 | 04/20/26 | 5.0 | 0.0 |
|
0.0 |
RPL10.INT.NS1.01800 |
RPL10.Interior.NS1 - Tie-ins - Control Fault Domain 2 SQ5.1 - WBS Summary | Tie-Ins NS1 Control Fault Domain 2 | Active | 04/20/26 | 08/06/26 | 96.2 | 75.0 |
|
62.5 |
RPL10.INT.NS1.01910 |
RPL10.Interior.NS1 - Control Fault Domain 1 SQ6.1 - Install Duct (LV Side) | LV Side Tie-ins | Complete | 04/20/26 | 04/20/26 | 5.0 | 0.0 |
|
0.0 |
RPL10.INT.NS1.01940 |
RPL10.Interior.NS1 - Tie-ins - Control Fault Domain 1 SQ6.1 - WBS Summary | Tie-Ins NS1 Control Fault Domain 1 | Active | 04/20/26 | 08/20/26 | 108.8 | 85.0 |
|
56.2 |
RPL10.INT.NS1.02480 |
RPL10.Interior.NS1 - OFE - Control Fault Domain 5 SQ2.1 (HAC) | OFE NS1 Control Fault Domain 5 | Active | 04/20/26 | 05/08/26 | 18.8 | 12.5 |
|
-5.0 |
RPL10.INT.NS2.01065 |
RPL10.Interior.NS2 - OFE - Electrical Panels (ATS,SB House,MCB,MLO, Transformer) - Set / Anchor | OFE | Active | 04/20/26 | 04/27/26 | 6.2 | 1.2 |
|
33.8 |
RPL10.INT.NS2.01130 |
RPL10.Interior.NS2 - Control Fault Domain 6 SQ1.2 - Install Duct (LV Side) | LV Side Tie-ins | Complete | 04/20/26 | 04/20/26 | 6.2 | 0.0 |
|
0.0 |
RPL10.INT.NS2.01160 |
RPL10.Interior.NS2 - Tie-ins - Control Fault Domain 6 SQ1.2 - WBS Summary | Tie-Ins NS2 Control Fault Domain 6 | Active | 04/20/26 | 06/22/26 | 56.2 | 50.0 |
|
27.5 |
RPL10.INT.NS2.01220 |
RPL10.Interior.NS2 - Control Fault Domain 6 SQ1.2 - Install LV Side Aisle HAC Busway | LV Side Tie-ins | Active | 04/20/26 | 05/11/26 | 6.2 | 13.8 |
|
31.2 |
RPL10.INT.NS2.01260 |
RPL10.Interior.NS2 - Control Fault Domain 5 SQ2.2 - Install Duct (LV Side) | LV Side Tie-ins | Complete | 04/20/26 | 04/20/26 | 5.0 | 0.0 |
|
0.0 |
RPL10.INT.NS2.01300 |
RPL10.Interior.NS2 - Tie-ins - Control Fault Domain 5 SQ2.2 - WBS Summary | Tie-Ins NS2 Control Fault Domain 5 | Active | 04/20/26 | 07/14/26 | 68.8 | 57.5 |
|
18.8 |
RPL10.INT.NS2.02020 |
RPL10.Interior.NS2 - OFE - Ancillary Skids - Set / Place / Anchor (04.01.26) | OFE | Complete | 04/20/26 | 04/24/26 | 5.0 | 0.0 |
|
0.0 |
RPL10.INT.NS3.02360 |
RPL10.Interior.NS3 - Priority - Install Security | OverHead | Complete | 04/20/26 | 04/21/26 | 2.5 | 0.0 |
|
0.0 |
RPL10.INT.NS4.02360 |
RPL10.Interior.NS4 - Priority - Install Security | OverHead | Complete | 04/20/26 | 04/21/26 | 2.5 | 0.0 |
|
0.0 |
RPL10.INT.SSBC.02900 |
RPL10.Interior.SSB-Corridor - BoW - Final Paint | Balance of Walls & OverHead | Complete | 04/20/26 | 04/24/26 | 6.2 | 0.0 |
|
0.0 |
RPL10.MCUP.LP1.1780 |
RPL10.MCUP.Loop 1 - Tie-in EPMS #5 | Tie-Ins EPMS | Active | 04/20/26 | 05/20/26 | 7.5 | 22.5 |
|
12.5 |
RPL10.MCUP.LP1.1840 |
RPL10.MCUP.Loop 1 - Install Sleeves MEPL | Hardscape and Landscape | Complete | 04/20/26 | 04/24/26 | 6.2 | 0.0 |
|
0.0 |
RPL10.MCUP.LP1.1900 |
RPL10.MCUP.Loop 1 - Tie-in EPMS #7 | Tie-Ins EPMS | Active | 04/20/26 | 05/20/26 | 8.8 | 22.5 |
|
12.5 |
RPL10.MCUP.LP2.1520 |
RPL10.MCUP.Loop 2 - Install Hardscape and Landscape - WBS Summary | Hardscape and Landscape | Active | 04/20/26 | 06/29/26 | 62.5 | 56.2 |
|
452.5 |
RPL10.MCUP.LP2.1540 |
RPL10.MCUP.Loop 2 - Install Sleeves MEPL | Hardscape and Landscape | Complete | 04/20/26 | 04/24/26 | 6.2 | 0.0 |
|
0.0 |
RPL10.MCUP.LP2.1800 |
RPL10.MCUP.Loop 2 - Tie-in Mechanical #4 WBS Summary | Tie-in Mechanical #4 | Active | 04/20/26 | 05/22/26 | 11.2 | 25.0 |
|
136.2 |
RPL10.MCUP.LP2.1920 |
RPL10.MCUP.Loop 2 - Tie-in Mechanical #6 WBS Summary | Tie-in Mechanical #6 | Active | 04/20/26 | 05/22/26 | 11.2 | 25.0 |
|
136.2 |
RPL10.MCUP.LP2.2020 |
RPL10.MCUP.Loop 2 - Tie-in Mechanical #8 WBS Summary | Tie-in Mechanical #8 | Active | 04/20/26 | 05/22/26 | 13.8 | 25.0 |
|
136.2 |
RPL10.MCUP.LP2.2640 |
RPL10.MCUP.Loop 2 - Facility Water Tie-in Mechanical #4 | Tie-in Mechanical #4 | Active | 04/20/26 | 05/15/26 | 3.8 | 18.8 |
|
142.5 |
RPL10.MCUP.LP2.2680 |
RPL10.MCUP.Loop 2 - Facility Water Tie-in Mechanical #6 | Tie-in Mechanical #6 | Active | 04/20/26 | 05/15/26 | 3.8 | 18.8 |
|
142.5 |
RPL10.MCUP.LP2.2720 |
RPL10.MCUP.Loop 2 - Facility Water Tie-in Mechanical #8 | Tie-in Mechanical #8 | Active | 04/20/26 | 05/18/26 | 3.8 | 0.0 |
|
142.5 |
RPL10.SSB.BB.1160 |
RPL10.Ext.Build Back.SSB - LO #5 - Install Waterproofing and Flashing | Build Back Exterior Leave Out Wall #5 (East SSB) | Complete | 04/20/26 | 04/20/26 | 2.5 | 0.0 |
|
0.0 |
RPL10.WP2.GSIDF.2000 |
RPL10.Conn Ext IDF Huts - Install GS Cabling Pull/Term/Test (13x GS.IDF) ~5060 LF - WBS Summary | Exterior | Active | 04/20/26 | 08/17/26 | 105.0 | 98.8 |
|
410.0 |
RPL10.WP2.GSIDF.2800 |
RPL10.Conn IDF Huts - (GSMDF to GSIDF) mCup NX11 WBS Summary | GSIDFNX11 | Active | 04/20/26 | 05/20/26 | 28.8 | 22.5 |
|
486.2 |
RPL10.WP2.GSIDF.2820 |
RPL10.Conn GSIDFNX11 Set Infrastructure (Racks, Waterfalls etc.) | Infrastructure | Complete | 04/20/26 | 04/24/26 | 6.2 | 0.0 |
|
0.0 |
RPL10.WP2.GSIDF.2880 |
RPL10.Conn IDF Huts - (GSMDF to GSIDF) mCup NX12 WBS Summary | GSIDFNX12 | Active | 04/20/26 | 06/01/26 | 37.5 | 31.2 |
|
477.5 |
RPL10.WP2.GSIDF.2900 |
RPL10.Conn GSIDFNX12 Set Infrastructure (Racks, Waterfalls etc.) | Infrastructure | Complete | 04/20/26 | 04/24/26 | 6.2 | 0.0 |
|
0.0 |
RPL10.WP2.GSIDF.2960 |
RPL10.Conn GSIDFNX13 Set Infrastructure (Racks, Waterfalls etc.) | Infrastructure | Complete | 04/20/26 | 04/24/26 | 6.2 | 0.0 |
|
0.0 |
RPL10.EY.NS4.01160 |
RPL10.EY.NS4 - Install Tent Overhead Doors | Tent and Temp Conditions | Active | 04/21/26 | 04/27/26 | 6.2 | 1.2 |
|
110.0 |
RPL10.INT.CTRC.01180 |
RPL10.Interior.Center-Corridor - BoW - Install Plumbing Lowside OH and In-wall | Balance of Walls & OverHead | Active | 04/21/26 | 04/27/26 | 6.2 | 1.2 |
|
136.2 |
RPL10.INT.ENDC.6300 |
RPL10.Interior.End-Corridor - Priority - P7 Wall Tape Finish Paint (Both Sides) | Priority Wall (P7) - Grid Line 10-02 | Active | 04/21/26 | 04/29/26 | 10.0 | 3.8 |
|
195.0 |
RPL10.INT.NS1.01145 |
RPL10.Interior.NS1 - OFE - Electrical Panels (ATS,SB House,MCB,MLO, Transformer) - Set / Anchor | OFE | Active | 04/21/26 | 04/27/26 | 6.2 | 1.2 |
|
37.5 |
RPL10.INT.NS1.02070 |
RPL10.Interior.NS1 - OFE - Ancillary Skids - Set / Place / Anchor (04.01.26) | OFE | Complete | 04/21/26 | 04/24/26 | 5.0 | 0.0 |
|
0.0 |
RPL10.INT.NS2.01490 |
RPL10.Interior.NS2 - OFE - Control Fault Domain 3 SQ4.2 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary | OFE NS2 Control Fault Domain 3 | Active | 04/21/26 | 07/16/26 | 76.2 | 20.0 |
|
-13.8 |
RPL10.INT.NS2.02625 |
RPL10.Interior.NS2 - OFE - Control Fault Domain 3 SQ4.2 (LV Side Aisle) | OFE NS2 Control Fault Domain 3 | Complete | 04/21/26 | 04/23/26 | 5.0 | 0.0 |
|
0.0 |
RPL10.INT.NS4.01070 |
RPL10.Interior.NS4 - OFE - MES Skids - Set / Place / Anchor | OFE | Active | 04/21/26 | 05/18/26 | 25.0 | 20.0 |
|
135.0 |
RPL10.INT.SSBC.02260 |
RPL10.Interior.SSB-Corridor - BoW - Install Electrical Carrier MDF (10.N1.09) | Balance of Walls & OverHead | Active | 04/21/26 | 04/29/26 | 8.8 | 3.8 |
|
218.8 |
RPL10.MCUP.LP2.1680 |
RPL10.MCUP.Loop 2 - Tie-in EPMS (LOE) | Tie-Ins EPMS | Active | 04/21/26 | 05/27/26 | 32.5 | 27.5 |
|
136.2 |
RPL10.MCUP.LP2.1700 |
RPL10.MCUP.Loop 2 - Tie-in EPMS #2 | Tie-Ins EPMS | Active | 04/21/26 | 05/22/26 | 8.8 | 8.8 |
|
138.8 |
RPL10.MCUP.LP2.1780 |
RPL10.MCUP.Loop 2 - Tie-in EPMS #4 | Tie-Ins EPMS | Active | 04/21/26 | 05/27/26 | 7.5 | 7.5 |
|
136.2 |
RPL10.SSB.BB.1180 |
RPL10.Ext.Build Back.SSB - LO #5 - Install IMP Exterior Panel | Build Back Exterior Leave Out Wall #5 (East SSB) | Complete | 04/21/26 | 04/21/26 | 2.5 | 0.0 |
|
0.0 |
RPL10.EY.EF2.01160 |
RPL10.EY.EF2 - Install RPL-3 FSP Columns F/R/P | Fiber Support Platform - RPL-3 | Active | 04/22/26 | 04/29/26 | 6.2 | 3.8 |
|
195.0 |
RPL10.EY.ENDC.01250 |
RPL10.EY.End - Install Temp Conditioning Units | OFE | Complete | 04/22/26 | 04/22/26 | 1.2 | 0.0 |
|
0.0 |
RPL10.EY.NS2.01240 |
RPL10.EY.NS2 - Install GS.IDF Hut (1x GS.IDF) NX06 (04.22.26) | OFE | Active | 04/22/26 | 04/28/26 | 6.2 | 2.5 |
|
37.5 |
RPL10.EY.NS2.01270 |
RPL10.EY.NS2 - Install GS.IDF Hut (1x GS.IDF) NX07 (04.22.26) | OFE | Active | 04/22/26 | 04/28/26 | 6.2 | 2.5 |
|
37.5 |
RPL10.EY.NS4.01180 |
RPL10.EY.NS4 - Install Tent Electrical Tie-ins | Tent and Temp Conditions | Complete | 04/22/26 | 04/24/26 | 3.8 | 0.0 |
|
0.0 |
RPL10.INT.CTRC.01630 |
RPL10.Interior.Center-Corridor - BoW - Install Refrigerant Piping Lowside OH on Supplemental Steel | Balance of Walls & OverHead | Active | 04/22/26 | 04/28/26 | 6.2 | 2.5 |
|
141.2 |
RPL10.INT.CTRC.07720 |
RPL10.Interior.Center-Corridor - Priority - Install Exterior Wall Drywall, Tape, Float, Paint (Remaining) | Priority Walls & OverHead | Active | 04/22/26 | 04/29/26 | 3.8 | 3.8 |
|
125.0 |
RPL10.INT.ENDC.01010 |
RPL10.Interior.End-Corridor - Priority - Install Duct (Highside OH space) | Priority Walls & OverHead | Active | 04/22/26 | 05/05/26 | 12.5 | 8.8 |
|
111.2 |
RPL10.INT.ENDC.1400 |
RPL10.Interior.End-Corridor - BoW - Install Door Frames | Balance of Walls & Overhead | Active | 04/22/26 | 04/28/26 | 6.2 | 2.5 |
|
190.0 |
RPL10.INT.NS1.01184 |
RPL10.Interior.NS1 - Electrical Panels/Ancillary Skid (ATS,SB House,MCB,MLO, Transformer) - Tie-ins | NS1 - LV Skids and TopHat | Active | 04/22/26 | 05/12/26 | 18.8 | 15.0 |
|
37.5 |
RPL10.INT.NS1.01280 |
RPL10.Interior.NS1 - Control Fault Domain 6 SQ1.1 - Set TWMS, UPS and Panel (2) | Remaining Tie-ins post Mech Side Aisle install | Active | 04/22/26 | 05/13/26 | 25.0 | 16.2 |
|
36.2 |
RPL10.INT.NS1.01330 |
RPL10.Interior.NS1 - Control Fault Domain 6 SQ1.1 - Install LV Side Aisle Cable Tray | LV Side Tie-ins | Active | 04/22/26 | 04/28/26 | 6.2 | 2.5 |
|
43.8 |
RPL10.INT.NS1.01460 |
RPL10.Interior.NS1 - Control Fault Domain 5 SQ2.1 - Install LV Side Aisle HAC Busway | LV Side Tie-ins | Active | 04/22/26 | 05/08/26 | 5.0 | 12.5 |
|
47.5 |
RPL10.INT.NS2.02485 |
RPL10.Interior.NS2 - OFE - Control Fault Domain 6 SQ1.2 - (Mech Side Aisle) | OFE NS2 Control Fault Domain 6 | Active | 04/22/26 | 05/11/26 | 22.5 | 13.8 |
|
-5.0 |
RPL10.INT.SSB.02520 |
RPL10.Interior.SSB - BoW - ACT - Set Wall Angle | Balance of Walls and OverHead | Active | 04/22/26 | 04/27/26 | 8.8 | 1.2 |
|
71.2 |
RPL10.MCUP.LP2.1660 |
RPL10.MCUP.Loop 2 - Tie-in BMS (LOE) | Tie-Ins BMS | Active | 04/22/26 | 05/28/26 | 31.2 | 28.8 |
|
136.2 |