## Overview The entries from May 1 to May 5, 2026, detail inspections and verifications conducted at the warehouse, focusing on the inventory and condition of various racks and equipment. The main themes include thorough checks of materials and preparation for upcoming tasks. ## By Area / Equipment - **Warehouse** - Inspected and counted: - 554 two-post racks - 12 four-post racks - 11 VCMs (Perry Brocato, 2026-05-01) - Verified all 554 two-post racks were up to specs and in good condition (Caleb Bourghs, 2026-05-01). - Inventoried CFCI equipment: - 97 18" ladder racks with 9" rung span - 74 cabinets, with 6 still in tent at site (Richard Coleman, 2026-05-01). - Verified new material and completed L1s (Caleb Bourghs, 2026-05-05). ## Issues / Open Items - None reported. ## Progress / Completed - Completed inspection of 554 two-post racks and verified their condition (2026-05-01). - Created templates for L1 connectivity material (2026-05-01). - Verified material at Mortenson Tent and arranged crew for pickup (2026-05-05). ## People Mentioned - Perry Brocato - Caleb Bourghs - Richard Coleman
Tuesday, May 05, 2026
Caleb Bourghs RPL · logged 05/06/2026 07:07 AM CT
Verified new material at Warehouse. Completed L1s and verified through OOR. Verified material at Mortenson Tent, arranged our crew to pick it up to bring to Tent 1.
Friday, May 01, 2026
Richard Coleman Warehouse · logged 05/05/2026 10:07 AM CT
Inventoried CFCI equipment. (97) 18" ladder rack with 9" rung span. Also, verified (74) cabinets at warehouse with (6) still in tent at site.
Caleb Bourghs WAREHOUSE, NCB · logged 05/01/2026 03:20 PM CT
Went through all material at Warehouse. Verify all material through OOR, receivables, and ACC website. Verified all 554 tWo post racks were fully up to specs and in good condition. Created all templates for our L1 connectivity materiaL
Perry brocato · logged 05/01/2026 09:51 AM CT
We were at the warehouse and we counted and inspected 554 2 post,12 4 post and 11 VCM.