## Overview This log covers activities from April 30, 2026, focusing on inspections and measurements at the GSIDFNX05 area. Key themes include equipment placement verification, issue identification, and quality control concerns regarding fiber handling. ## By Area / Equipment - **GSIDFNX05** - Racks placed according to prints and measurements taken for correct positioning. - Issues reported by Super Chance: - Issue #6395: MOFE Door - Issue #6393: Labeling Conflict - Splice cassette alignment reviewed with Super Chance to ensure proper alignment with FE labels. - Observed fiber clippings left on the floor by Clear Core. - Fiber dressing in the 432 can and 1u unican fiber enclosure found not up to standard; Clear Core was called back for corrections. ## Issues / Open Items - Issue #6395: MOFE Door (April 30, 2026) - Issue #6393: Labeling Conflict (April 30, 2026) - Fiber dressing issues in the 432 can and 1u unican fiber enclosure (April 30, 2026). ## Progress / Completed - Racks in CMDF2 were successfully landed according to prints (April 30, 2026). ## People Mentioned - Timeon P. - Super Chance - Richard
Thursday, April 30, 2026
Timeon P. GSIDFNX05 · logged 04/30/2026 04:49 PM CT
Walked CMDF2 and took measurements to ensure that the racks placed were at the correct locations before being anchored. Racks were landed according to prints. Super Chance informed us about issues he noticed in the field, took pictures and created formal issues in ACC, listed below: Issue #6395 GSIDFNX05 MOFE Door Issue #6393 GSIDFNX05 Labeling Conflict Richard reviewed splice cassette alignment with chance to ensure that they were aligned with the FE labels Walked the GSIDFNX05 and noticed that Clear Core left fiber clippings on the floor and that the fiber dressing in both the 432 can and the 1u unican fiber enclosure was not up to standard, they were called back to correct the dressing.