## Overview The entries from April 30, 2026, detail inspections and measurements taken in the CMDF2 area, highlighting issues related to equipment placement, labeling conflicts, and housekeeping standards. The team coordinated closely to identify and document several issues requiring follow-up. ## By Area / Equipment - **CMDF2** - Measurements taken to ensure racks were correctly placed before anchoring. - Verified VCM measurements met requirements and standards. - Issue #6391: South & West wall vertical ladder rack locations blocked by EPMS/BAS conduit. - **GSIDFNX05** - Issue #6395: MOFE Door noted by Super Chance. - Issue #6393: Labeling conflict reported. - Fiber clippings left on the floor; dressing in 432 can and 1u unican fiber enclosure not up to standard. ## Issues / Open Items - Issue #6395: GSIDFNX05 MOFE Door (4/30/2026) - Issue #6393: GSIDFNX05 Labeling Conflict (4/30/2026) - Issue #6394: Concrete hole on East Wall in CMDF1 (4/30/2026) - Issue #6391: CMDF2 ladder rack locations blocked by conduit (4/30/2026) - Need for Clearcore to correct fiber dressing and splicing issues (4/30/2026) ## Progress / Completed - Racks in CMDF2 landed according to prints (4/30/2026). - Verified splicing in IDFNX5 (4/30/2026). ## People Mentioned - Timeon P. - Super Chance - Caleb Bourghs - Richard
Thursday, April 30, 2026
Caleb Bourghs RPL10, CMDF1, CMDF2, GSIDFNX5 · logged 04/30/2026 04:54 PM CT
Started with daily specs, site updates, and team coordination. CMDF1, CMDF2, IDFNX5 Walk Throughs with QA Team. Created 2 Issues- Issue #6394: Concrete has a hole on the East Wall 66 1/2 inches from the South wall in CMDF1. Hole is 2 1/2 inches in length and 1 inch wide. Hole is where the first VCM will be located. Issue #6391: CMDF2 South & West wall vertical ladder rack locations blocked by EPMS/BAS conduit. Other team members placed 3 other issues today we found in the field during our walk-through. Verified specs and measurements for our CMDF2 VCMs on-site. All measurements met requirements and standards. Verified splicing in our IDFNX5. Reported findings to our Super Intendant Chance to contact Clearcore to make needed changes to meet all Splicing specs/Housekeeping.
Timeon P. GSIDFNX05 · logged 04/30/2026 04:49 PM CT
Walked CMDF2 and took measurements to ensure that the racks placed were at the correct locations before being anchored. Racks were landed according to prints. Super Chance informed us about issues he noticed in the field, took pictures and created formal issues in ACC, listed below: Issue #6395 GSIDFNX05 MOFE Door Issue #6393 GSIDFNX05 Labeling Conflict Richard reviewed splice cassette alignment with chance to ensure that they were aligned with the FE labels Walked the GSIDFNX05 and noticed that Clear Core left fiber clippings on the floor and that the fiber dressing in both the 432 can and the 1u unican fiber enclosure was not up to standard, they were called back to correct the dressing.