## Overview
This briefing covers the period from April 28 to May 5, 2026. Key themes include ongoing inspections, identification of issues in various areas, and material verification at the warehouse.
## By Area / Equipment
- **RPL10.CMDF 1/2**
- Pre-installation walkthrough completed; one issue documented (Issue #5174).
- Horizontal ladder runway adjustments required to allow for fiber routing.
- **RPL10 GSEF 1/2, CMDF 1/2, IDFNX5**
- Field walk completed; temporary splices of two 192 fibers in IDFNX5 were finished by Clear Core.
- Photos taken of temporary 2 post rack in GSEF 1.
- **GSIDFNX05**
- Measurements taken to ensure correct rack placement.
- Multiple issues documented by Super Chance, including door and labeling conflicts (Issues #6395 and #6393).
- Fiber clippings and dressing issues noted; Clear Core called back for corrections.
- **Warehouse**
- Inspected and counted 554 two-post racks, 12 four-post racks, and 11 VCMs.
- Verified material and templates for L1 connectivity.
## Issues / Open Items
- Issue #5174 documented on April 28 (RPL10.CMDF 1/2).
- Issue #6395: GSIDFNX05 MOFE Door (April 30).
- Issue #6393: GSIDFNX05 Labeling Conflict (April 30).
- Issue #6394: Concrete hole in CMDF1 (April 30).
- Issue #6391: Blocked ladder rack locations in CMDF2 (April 30).
- Fiber dressing and cleanup issues in GSIDFNX05 (April 30).
## Progress / Completed
- Pre-installation walkthrough of CMDF 1/2 completed on April 28.
- Field walk with FE team through GSEF 1/2, CMDF 1/2, and IDFNX5 completed on April 30.
- Measurements for CMDF2 VCMs verified on April 30.
- Material verification and inventory completed at the warehouse on May 1.
- L1s verified and material arranged for pickup on May 5.
## People Mentioned
- Timeon P.
- Super Chance
- Caleb Bourghs
- Perry Brocato
- Richard Coleman
Tuesday, May 05, 2026
Caleb Bourghs
RPL
· logged 05/06/2026 07:07 AM CT
Verified new material at Warehouse. Completed L1s and verified through OOR. Verified material at Mortenson Tent, arranged our crew to pick it up to bring to Tent 1.
Friday, May 01, 2026
Richard Coleman
Warehouse
· logged 05/05/2026 10:07 AM CT
Inventoried CFCI equipment. (97) 18" ladder rack with 9" rung span. Also, verified (74) cabinets at warehouse with (6) still in tent at site.
Caleb Bourghs
WAREHOUSE, NCB
· logged 05/01/2026 03:20 PM CT
Went through all material at Warehouse. Verify all material through OOR, receivables, and ACC website. Verified all 554 tWo post racks were fully up to specs and in good condition. Created all templates for our L1 connectivity materiaL
Perry brocato
· logged 05/01/2026 09:51 AM CT
We were at the warehouse and we counted and inspected 554 2 post,12 4 post and 11 VCM.
Thursday, April 30, 2026
Caleb Bourghs
RPL10, CMDF1, CMDF2, GSIDFNX5
· logged 04/30/2026 04:54 PM CT
Started with daily specs, site updates, and team coordination.
CMDF1, CMDF2, IDFNX5 Walk Throughs with QA Team.
Created 2 Issues- Issue #6394: Concrete has a hole on the East Wall 66 1/2 inches from the South wall in CMDF1. Hole is 2 1/2 inches in length and 1 inch wide. Hole is where the first VCM will be located.
Issue #6391: CMDF2 South & West wall vertical ladder rack locations blocked by EPMS/BAS conduit.
Other team members placed 3 other issues today we found in the field during our walk-through.
Verified specs and measurements for our CMDF2 VCMs on-site. All measurements met requirements and standards.
Verified splicing in our IDFNX5. Reported findings to our Super Intendant Chance to contact Clearcore to make needed changes to meet all Splicing specs/Housekeeping.
Timeon P.
GSIDFNX05
· logged 04/30/2026 04:49 PM CT
Walked CMDF2 and took measurements to ensure that the racks placed were at the correct locations before being anchored. Racks were landed according to prints.
Super Chance informed us about issues he noticed in the field, took pictures and created formal issues in ACC, listed below:
Issue #6395 GSIDFNX05 MOFE Door
Issue #6393 GSIDFNX05 Labeling Conflict
Richard reviewed splice cassette alignment with chance to ensure that they were aligned with the FE labels
Walked the GSIDFNX05 and noticed that Clear Core left fiber clippings on the floor and that the fiber dressing in both the 432 can and the 1u unican fiber enclosure was not up to standard, they were called back to correct the dressing.
Timeon P.
RPL10 GSEF 1/2, CMDF 1/2, IDFNX5
· logged 04/30/2026 01:37 PM CT
Completed a field walk with the FE team through the GSEF's 1/2, CMDF 1/2, and IDFNX5.
Photos of the temporary 2 post rack in GSEF 1 for the temporary splices were taken. Temp splices of two 192 fibers in IDFNX5 were completed by Clear Core.
SFE Paul informed us that the horizontal ladder runway in both CMDF's will have to move away from their respective walls by approx. 5" to allow for adequate space for the fiber to be routed within the bend radius. The changes will be redlined after installation per Hargis. This will also allow for the horizontal crossovers to be installed with out the overhead support. As the CMDF's have been buildout to spec, the FE's are reviewing to see if this will be a change order.
Tuesday, April 28, 2026
Timeon P.
RPL10.CMDF 1/2
· logged 04/30/2026 07:03 AM CT
Completed a pre-installation walkthrough of CMDF 1/2. Took measurements of the room and found one issue, that was documented (Issue #5174).